 "generatedAt": "2026-11-12",
 "attribution": "Greek Water Reports · waterintel.eu — compiled from Diavgeia decisions (ΑΔΑ-traceable) and named public registers. Free to reuse with attribution. Counts are floors of what the public record holds; absence is stated, never inferred.",
 "registryCompiledAt": "2026-10-14",
 "method": "Facility registry compiled from Diavgeia acts (subject searches per half-year window, 2010–2026; PDF text read for permits), the ΗΠΜ environmental register (api.eprm.ypen.gr, full pull), Solomon's published site dataset (ΓΕΜΗ entity, address, MW, m², coordinates), Data Center Map listings, the PwC siting study (2026-03-13) and dated press / official reports. Every figure carries its source; absence is stated, never inferred.",
 "diavgeiaCorpus": {
  "acts": 9657,
  "by_kind": {
   "energy_licence": 15,
   "facility_permit": 136,
   "operator_named": 853,
   "other": 1681,
   "public_sector_it": 6796,
   "siting_policy": 7,
   "strategic_invest": 7,
   "utility_connection": 162
  },
  "texts_read": 921,
  "queries": "scripts: bm4040/dc/pull_dc_acts.py, classify_dc_acts.py"
 },
 "eprmRegister": {
  "decisions_pulled": 20249,
  "datacentre_decisions": 5,
  "pulled_at": "2026-10-14",
  "script": "pull_eprm.py"
 },
 "solomonDataset": {
  "sites": 34,
  "pulled_at": "2026-10-14",
  "url": "https://wearesolomon.com/datacenters-gr/",
  "note": "Third-party input, linked not redistributed."
 },
 "market": {
  "operating": {
   "sites": 21,
   "mw": 44,
   "gwh": 65,
   "source": "Solomon, 16 Sep 2026, citing PwC Stream I (2024 base year)"
  },
  "connected": {
   "projects": 8,
   "mw": 547.5,
   "attica": {
    "projects": 7,
    "mw": 507.5
   },
   "korinthia": {
    "projects": 1,
    "mw": 40
   },
   "source": "ΑΔΜΗΕ reply to Solomon, spring 2026"
  },
  "queued": {
   "requests": 30,
   "gw": 3,
   "source": "ΑΔΜΗΕ via Solomon; Fthiotida, Boeotia, Kozani, Thessaloniki, Evros"
  },
  "distribution2034": {
   "mw": 350,
   "twh": 1.3,
   "requestedMw": 220,
   "source": "ΔΕΔΔΗΕ presentation, RAAEY / Enterprise Greece event, 90th ΔΕΘ, Sep 2026"
  }
 },
 "trail": [
  {
   "when": "2024-01-15",
   "label": "Π.Δ. 15-01-2024 (ΦΕΚ Δ' 5): ΕΣΧΑΣΕ approved for three Microsoft data centres in Attica",
   "kind": "spatial",
   "url": null
  },
  {
   "when": "2024-04-08",
   "label": "Δήμος Σπάτων-Αρτέμιδος council opinion on the Microsoft ΜΠΕ (ΑΔΣ 59/2024)",
   "kind": "consultation",
   "url": "https://diavgeia.gov.gr/decision/view/9%CE%94%CE%980%CE%A91%CE%A7-%CE%A0%CE%99%CE%A8"
  },
  {
   "when": "2024-09-11",
   "label": "ΚΥΑ 69748/2024: siting + environmental terms, Microsoft ATH04 — 19.2 MW IT, ≈8,856 m³/yr cooling from the municipal mains",
   "kind": "aepo",
   "url": "https://diavgeia.gov.gr/decision/view/%CE%A85%CE%9A%CE%9246%CE%9D%CE%9B%CE%A3%CE%9E-%CE%A1%CE%93%CE%93"
  },
  {
   "when": "2025-06-30",
   "label": "Spata council approves two Φ63 mm mains connections for the Microsoft site (ΑΔΣ 107/2025)",
   "kind": "mains",
   "url": "https://diavgeia.gov.gr/decision/view/%CE%A8%CE%9B%CE%9F%CE%97%CE%A91%CE%A7-%CE%A6%CE%985"
  },
  {
   "when": "2025-07-29",
   "label": "ΚΥΑ ΥΠΕΝ/ΔΙΠΑ/82255/5190 (Β' 4095): standard environmental terms for 2–20 MW data centres — 20 working days, no consultation",
   "kind": "rule",
   "url": "https://www.e-nomothesia.gr/kat-periballon/periballontike-adeiodotese/kya-upen-dipa-82255-5190-2025.html"
  },
  {
   "when": "2025-11-25",
   "label": "Spata residents' committee appeals the standard-terms ΚΥΑ to the Council of State",
   "kind": "challenge",
   "url": "https://ypodomes.com/antidraseis-gia-ti-dimioyrgia-trion-data-centers-sta-spata-apo-epitropi-katoikon/"
  },
  {
   "when": "2026-01-19",
   "label": "ΑΕΠΟ: Olive, Spata–Artemida, 80 MW, declared air-cooled (6ΜΣΡΟΡ1Κ-Ν1Θ)",
   "kind": "aepo",
   "url": "https://diavgeia.gov.gr/decision/view/6%CE%9C%CE%A3%CE%A1%CE%9F%CE%A11%CE%9A-%CE%9D1%CE%98"
  },
  {
   "when": "2026-06-11",
   "label": "ΑΕΠΟ: DATA4 Hermes ATH01, Paiania, 80 MW; on-site abstraction points listed, no water permit yet (9ΚΧΧΟΡ1Κ-02Α)",
   "kind": "aepo",
   "url": "https://diavgeia.gov.gr/decision/view/9%CE%9A%CE%A7%CE%A7%CE%9F%CE%A11%CE%9A-02%CE%91"
  },
  {
   "when": "2026-06-20",
   "label": "ΥΠΕΝ internal report on data-centre water needs: negligible nationally, local in Spata and Thessaly (unpublished; via Solomon)",
   "kind": "report",
   "url": "https://www.documentcloud.org/documents/28651460-upen-solomon-data-centers-ellada-anagkes-se-nero"
  },
  {
   "when": "2024-02-22",
   "label": "The one abstraction licence: Digital Realty, Κρωπία, 2,220 m³/yr for landscaping (ΨΟΟ2ΟΡ1Κ-ΟΞΞ)",
   "kind": "licence",
   "url": "https://diavgeia.gov.gr/decision/view/%CE%A8%CE%9F%CE%9F2%CE%9F%CE%A11%CE%9A-%CE%9F%CE%9E%CE%9E"
  }
 ],
 "wue": {
  "source": "ΥΠΕΝ (Αλ. Κουλίδης), 'Κέντρα Δεδομένων και κατανάλωση νερού στην Ελλάδα', 20 Jun 2026 — via Solomon",
  "url": "https://www.documentcloud.org/documents/28651460-upen-solomon-data-centers-ellada-anagkes-se-nero",
  "loadFactor": 0.9,
  "options": [
   {
    "key": "air",
    "label": "air-cooled",
    "wue": 0
   },
   {
    "key": "closed",
    "label": "closed loop (Microsoft FY25)",
    "wue": 0.3
   },
   {
    "key": "mixed",
    "label": "mixed / adiabatic",
    "wue": 0.84
   },
   {
    "key": "evap",
    "label": "evaporative (industry avg.)",
    "wue": 1.9
   }
  ],
  "householdM3y": 417,
  "stremmaM3y": 600
 },
 "headroom2034": {
  "source": "PwC for the Greek government, 'Grid Capacity for DCs — KtP Stream II' (confidential, presented 13 Mar 2026; obtained and published by Solomon, DocumentCloud 28651462). MW available for data-centre connection in 2034 assuming the operators' planned works complete; regional figures are not summable; max single site per region.",
  "url": "https://www.documentcloud.org/documents/28651462-pwc-solomon-grid-capacity-for-dcs-ktp-stream-ii-vshared-1",
  "regions": [
   {
    "key": "west-macedonia",
    "en": "W. Macedonia",
    "lon": 21.4,
    "lat": 40.5,
    "mw": 630,
    "points": 6,
    "maxSite": 300
   },
   {
    "key": "thessaly",
    "en": "Thessaly",
    "lon": 22.35,
    "lat": 39.45,
    "mw": 605,
    "points": 4,
    "maxSite": 300
   },
   {
    "key": "central-macedonia",
    "en": "C. Macedonia",
    "lon": 23,
    "lat": 40.75,
    "mw": 485,
    "points": 13,
    "maxSite": 150
   },
   {
    "key": "sterea-ellada",
    "en": "Sterea Ellada",
    "lon": 22.55,
    "lat": 38.6,
    "mw": 480,
    "points": 5,
    "maxSite": 250
   },
   {
    "key": "east-macedonia-thrace",
    "en": "E. Macedonia & Thrace",
    "lon": 24.9,
    "lat": 41.1,
    "mw": 375,
    "points": 5,
    "maxSite": 150
   },
   {
    "key": "epirus-west-greece",
    "en": "Epirus / W. Greece",
    "lon": 20.95,
    "lat": 39.1,
    "mw": 250,
    "points": 3,
    "maxSite": 150
   },
   {
    "key": "peloponnese",
    "en": "Peloponnese",
    "lon": 22.3,
    "lat": 37.45,
    "mw": 210,
    "points": 6,
    "maxSite": 100
   },
   {
    "key": "attica",
    "en": "Attica",
    "lon": 23.85,
    "lat": 38.05,
    "mw": 180,
    "points": 7,
    "maxSite": 100
   },
   {
    "key": "crete",
    "en": "Crete",
    "lon": 25,
    "lat": 35.2,
    "mw": 140,
    "points": 9,
    "maxSite": 30
   }
  ]
 },
 "sites": [
  {
   "id": "microsoft-ath04-spata",
   "operator": "Microsoft (Microsoft Operations 4733 Hellas)",
   "project": "Azure Greece Central — ATH04",
   "site": "Σπάτα, Πέτρα Γιαλού–Αγ. Ανάργυροι",
   "municipality": "Σπάτων-Αρτέμιδος",
   "municipality_slug": "spaton-artemidos",
   "region": "Attica",
   "grid_region": "attica",
   "status": "construction",
   "it_mw": 19.2,
   "installed_mw": 25,
   "investment_eur": 976000000,
   "investment_note": "€976 M excl. VAT for the three-facility region (in.gr 2026-09-19); ΥΠΕΝ report: €1 bn+",
   "cooling": "evaporative only on days above 29 °C; otherwise dry (declared in ΚΥΑ 69748/2024); press calls it water-based (powergame 2025-11-27); Microsoft: 'water positive by 2030', moving to closed loop (ΥΠΕΝ report)",
   "water_source": "municipal mains (ΕΥΔΑΠ-sourced, two Φ63 taps approved by Spata council ΑΔΣ 107/2025)",
   "water_m3y": 8856,
   "water_note": "8,856 m³/yr cooling, 1,476 m³ recovered; 5 m³/day potable — company-stated in the act",
   "strategic_investment": "ΕΣΧΑΣΕ Π.Δ. 15-01-2024 (ΦΕΚ Δ' 5/2024); ΔΕΣΕ incentives 6ΝΞΚ46ΝΛΣΞ-Ι09 (2024-01-10)",
   "timeline": "works started 2024; completion targeted Q4 2027; first customers 2028 (ot.gr 2026-10-03)",
   "acts": [
    {
     "ada": "Ψ5ΚΒ46ΝΛΣΞ-ΡΓΓ",
     "what": "ΚΥΑ 69748/2024 siting + environmental terms",
     "date": "2024-09-11",
     "url": "https://diavgeia.gov.gr/decision/view/Ψ5ΚΒ46ΝΛΣΞ-ΡΓΓ"
    },
    {
     "ada": "6ΝΞΚ46ΝΛΣΞ-Ι09",
     "what": "strategic-investment incentives",
     "date": "2024-01-10",
     "url": "https://diavgeia.gov.gr/decision/view/6ΝΞΚ46ΝΛΣΞ-Ι09"
    },
    {
     "ada": "ΩΧΕΗ4653Π4-ΗΛΑ",
     "what": "ΣΜΠΕ approval 'Investment in Data Centres in Greece'",
     "date": "2023-04-13",
     "url": "https://diavgeia.gov.gr/decision/view/ΩΧΕΗ4653Π4-ΗΛΑ"
    },
    {
     "ada": "9ΔΘ0Ω1Χ-ΠΙΨ",
     "what": "Spata council opinion on the ΜΠΕ (ΑΔΣ 59/2024)",
     "date": "2024-04-08",
     "url": "https://diavgeia.gov.gr/decision/view/9ΔΘ0Ω1Χ-ΠΙΨ"
    },
    {
     "ada": "Ψ9ΦΛ46Ψ842-Υ1Ζ",
     "what": "building permit — earthworks, retaining walls",
     "date": "2024-01-23",
     "url": "https://diavgeia.gov.gr/decision/view/Ψ9ΦΛ46Ψ842-Υ1Ζ"
    },
    {
     "ada": "ΨΦΨΘ46Ψ842-ΘΜΡ",
     "what": "building permit 2nd revision — substation relocation",
     "date": "2025-07-30",
     "url": "https://diavgeia.gov.gr/decision/view/ΨΦΨΘ46Ψ842-ΘΜΡ"
    },
    {
     "ada": "9ΧΠΩ46Ψ842-0ΣΑ",
     "what": "building permit 3rd revision",
     "date": "2026-09-21",
     "url": "https://diavgeia.gov.gr/decision/view/9ΧΠΩ46Ψ842-0ΣΑ"
    },
    {
     "ada": "9ΜΞΦ4653Π8-33Π",
     "what": "ETS greenhouse-gas permit (backup generation)",
     "date": "2026-06-04",
     "url": "https://diavgeia.gov.gr/decision/view/9ΜΞΦ4653Π8-33Π"
    }
   ],
   "sources": [
    {
     "title": "Data centers στην Ελλάδα: Οι επενδύσεις, τα έργα και το deal ΔΕΗ με Amazon",
     "publisher": "in.gr",
     "date": "2026-09-19",
     "url": "https://www.in.gr/2026/09/19/economy/data-centers-stin-ellada-oi-ependyseis-ta-erga-kai-to-deal-dei-me-amazon/"
    },
    {
     "title": "Data centers: Το μεγάλο στοίχημα για την Ελλάδα της Τεχνητής Νοημοσύνης (Advanced Telecoms Summit, 29 Sep 2026)",
     "publisher": "ot.gr",
     "date": "2026-10-03",
     "url": "https://www.ot.gr/2026/10/03/texnologia/data-centers-to-megalo-stoixima-gia-tin-ellada-tis-texnitis-noimosynis"
    },
    {
     "title": "ΥΠΕΝ (Αλ. Κουλίδης), Κέντρα Δεδομένων και κατανάλωση νερού στην Ελλάδα — via Solomon",
     "publisher": "ΥΠΕΝ / Solomon",
     "date": "2026-06-20",
     "url": "https://www.documentcloud.org/documents/28651460-upen-solomon-data-centers-ellada-anagkes-se-nero"
    },
    {
     "title": "Χωρίς σχέδιο η Ελλάδα για τα data centers (investigation + published site dataset 'Χάρτης Data Centers')",
     "publisher": "Solomon",
     "date": "2026-09-16",
     "url": "https://wearesolomon.com/mag/format-el/erevnes/xoris-sxedio-i-ellada-gia-ta-data-centers/"
    },
    {
     "title": "GRDCA at Advanced Telecoms Summit 2026: Greece moves from announcements to implementation",
     "publisher": "grdca.gr",
     "date": "2026-10-08",
     "url": "https://grdca.gr/grdca-at-advanced-telecoms-summit-2026-greece-moves-from-announcements-to-implementation/"
    },
    {
     "title": "Greece's AI Data Center Boom Hinges on Finding Enough Power",
     "publisher": "tovima.com",
     "date": "2026-09-28",
     "url": "https://www.tovima.com/finance/greeces-ai-data-center-boom-hinges-on-finding-enough-power/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.renco.it/projects/microsoft-data-center"
    }
   ],
   "legal_entity": "Microsoft Operations 4733 Hellas Μονοπρόσωπη Ανώνυμη Εταιρεία",
   "gemi_url": "https://publicity.businessportal.gr/company/160364901000",
   "address": "https://maps.app.goo.gl/7bmZjVRBCj8np1to8",
   "floor_m2": "",
   "solomon_status": "UNDER CONSTRUCTION",
   "solomon_mw": "25 MW",
   "lat": 37.97631,
   "lon": 23.930908,
   "geo_precision": "exact",
   "eprm_ids": "41542",
   "eprm_adas": "Ψ5ΚΒ46ΝΛΣΞ-ΡΓΓ"
  },
  {
   "id": "microsoft-koropi-pallini",
   "operator": "Microsoft (two facilities built with Digital Realty and Data4)",
   "project": "Azure Greece Central — facilities 2 and 3",
   "site": "Κορωπί · Παλλήνη (per ΥΠΕΝ report); ΔΕΣΕ act names Κρωπίας, Σπάτων-Αρτέμιδος, Αμαρουσίου",
   "municipality": "Κρωπίας / Παλλήνης",
   "municipality_slug": "kropias",
   "region": "Attica",
   "grid_region": "attica",
   "status": "planned",
   "it_mw": null,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "within the €976 M region total",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "same ΕΣΧΑΣΕ / ΔΕΣΕ as ATH04",
   "timeline": "two of three facilities to be built by partners; region ready Q4 2027 (ot.gr 2026-10-03)",
   "acts": [
    {
     "ada": "6ΝΞΚ46ΝΛΣΞ-Ι09",
     "what": "strategic-investment incentives (three sites)",
     "date": "2024-01-10",
     "url": "https://diavgeia.gov.gr/decision/view/6ΝΞΚ46ΝΛΣΞ-Ι09"
    }
   ],
   "sources": [
    {
     "title": "ΥΠΕΝ (Αλ. Κουλίδης), Κέντρα Δεδομένων και κατανάλωση νερού στην Ελλάδα — via Solomon",
     "publisher": "ΥΠΕΝ / Solomon",
     "date": "2026-06-20",
     "url": "https://www.documentcloud.org/documents/28651460-upen-solomon-data-centers-ellada-anagkes-se-nero"
    },
    {
     "title": "Data centers: Η Ελλάδα περνά από τις ανακοινώσεις στα MW",
     "publisher": "insider.gr",
     "date": "2026-10-04",
     "url": "https://www.insider.gr/tehnologia/427209/data-centers-i-ellada-perna-apo-tis-anakoinoseis-sta-mw-ta-epomena-orosima"
    },
    {
     "title": "Data centers: Το μεγάλο στοίχημα για την Ελλάδα της Τεχνητής Νοημοσύνης (Advanced Telecoms Summit, 29 Sep 2026)",
     "publisher": "ot.gr",
     "date": "2026-10-03",
     "url": "https://www.ot.gr/2026/10/03/texnologia/data-centers-to-megalo-stoixima-gia-tin-ellada-tis-texnitis-noimosynis"
    }
   ],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "olive-spata",
   "operator": "Apto DC / Dromeus Capital (vehicle: ΓΚΡΕΚΟ ΜΙ Επενδύσεις Ακινήτων Μ.Α.Ε.; PIMCO-backed fund per ered.gr)",
   "project": "Data Center Olive — Apto Athens Campus (DC1 + DC2)",
   "site": "Σπάτα, Χριστούπολη, θέση Πέτρα Γιαλού–Βούλια–Προκαλήσι, 6.23 ha, opposite ACG East Campus",
   "municipality": "Σπάτων-Αρτέμιδος",
   "municipality_slug": "spaton-artemidos",
   "region": "Attica",
   "grid_region": "attica",
   "status": "permitted",
   "it_mw": 80,
   "installed_mw": 80,
   "investment_eur": 300000000,
   "investment_note": "€300 M; 80 MW / 80 MVA substation (powergame 2025-11-27); ΑΔΜΗΕ connection contract terms signed",
   "cooling": "air-cooled (fans / free cooling, LEED for Data Centers — the only one of the three Spata sites not water-cooled, powergame 2025-11-27); 40 rooftop diesel generators",
   "water_source": "ΕΥΔΑΠ network (ΑΕΠΟ terms: network water, leak control, reuse where feasible)",
   "water_m3y": null,
   "water_note": "no annual m³ figure in the ΑΕΠΟ text; 'rational water use' claimed",
   "strategic_investment": "",
   "timeline": "ΑΕΠΟ 2026-01-19 (ΗΠΜ 14966); non-essential modification refused 2026-03-17 (ΗΠΜ 45376, outcome negative); municipal council negative opinions; phase 1 targeted autumn 2026 (powergame 2025-11); residents' Council of State appeal",
   "acts": [
    {
     "ada": "6ΜΣΡΟΡ1Κ-Ν1Θ",
     "what": "ΑΕΠΟ, Decentralised Administration of Attica",
     "date": "2026-01-19",
     "url": "https://diavgeia.gov.gr/decision/view/6ΜΣΡΟΡ1Κ-Ν1Θ"
    },
    {
     "ada": "Ρ5Ζ3Ω1Χ-ΔΙΨ",
     "what": "Spata council decision on the ΜΠΕ (ΑΔΣ 144/2025)",
     "date": "2025-09-26",
     "url": "https://diavgeia.gov.gr/decision/view/Ρ5Ζ3Ω1Χ-ΔΙΨ"
    },
    {
     "ada": "6ΤΣΙ46Ψ842-Δ48",
     "what": "building-permit pre-approval, 2-storey DC (owner ΓΚΡΕΚΟ ΜΙ)",
     "date": "2026-01-12",
     "url": "https://diavgeia.gov.gr/decision/view/6ΤΣΙ46Ψ842-Δ48"
    },
    {
     "ada": "9ΜΦ846Ψ842-ΜΛΣ",
     "what": "building-permit pre-approval, 2-storey DC",
     "date": "2026-09-14",
     "url": "https://diavgeia.gov.gr/decision/view/9ΜΦ846Ψ842-ΜΛΣ"
    }
   ],
   "sources": [
    {
     "title": "ΥΠΕΝ (Αλ. Κουλίδης), Κέντρα Δεδομένων και κατανάλωση νερού στην Ελλάδα — via Solomon",
     "publisher": "ΥΠΕΝ / Solomon",
     "date": "2026-06-20",
     "url": "https://www.documentcloud.org/documents/28651460-upen-solomon-data-centers-ellada-anagkes-se-nero"
    },
    {
     "title": "Data Centers: Greece's Next Investment Frontier and the Challenges of Energy and Water",
     "publisher": "tovima.com",
     "date": "2026-01-02",
     "url": "https://www.tovima.com/finance/data-centers-greeces-next-investment-frontier-and-the-challenges-of-energy-and-water/"
    },
    {
     "title": "Φουντώνουν οι αντιδράσεις για το data center των 300 εκατ. της Dromeus Capital στα Σπάτα (Olive)",
     "publisher": "powergame.gr",
     "date": "2025-11-27",
     "url": "https://www.powergame.gr/akinita/1215710/fountonoun-oi-antidraseis-gia-to-data-center-ton-300-ekat-tis-dromeus-capital-sta-spata/"
    },
    {
     "title": "Regulatory approval secured for “Data Center Olive” project in Spata",
     "publisher": "ered.gr",
     "date": "2026-01",
     "url": "https://ered.gr/en/regulatory-approval-secured-for-data-center-olive-project-in-spata/"
    },
    {
     "title": "Greece heavily invests in AI data centers, often leaving environmental studies aside",
     "publisher": "keeptalkinggreece.com",
     "date": "2026-06-04",
     "url": "https://www.keeptalkinggreece.com/2026/06/04/ai-data-centers-greece-investment/"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Τα data centers που θα χτιστούν σε ελληνικό έδαφος",
     "publisher": "tanea.gr",
     "date": "2025-03-08",
     "url": "https://www.tanea.gr/2025/03/08/economy/ta-data-centers-pou-tha-xtistoun-se-elliniko-edafos-online/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://bizness.gr/se-tria-quot-metopa-quot-ependyei-i-dromeus-capital-poia-ta-nea-projects-se-attiki-kai-dytika-proastia/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://ered.gr/en/regulatory-approval-secured-for-data-center-olive-project-in-spata/"
    }
   ],
   "legal_entity": "ΓΚΡΕΚΟ ΜΙ ΕΠΕΝΔΥΣΕΙΣ ΑΚΙΝΗΤΩΝ ΜΟΝΟΠΡΟΣΩΠΗ ΑΝΩΝΥΜΗ ΕΤΑΙΡΕΙΑ",
   "gemi_url": "https://publicity.businessportal.gr/company/154356701000",
   "address": "Θέση Πέτρα Γιαλού – Βούλια – Προκαλήσι, Χριστούπολη, Σπάτα",
   "floor_m2": "",
   "solomon_status": "PLANNING",
   "solomon_mw": "80 MW",
   "lat": 37.96464080000001,
   "lon": 23.9070776,
   "geo_precision": "area",
   "eprm_ids": "45376 | 14966",
   "eprm_adas": "6ΜΣΡΟΡ1Κ-Ν1Θ | 6ΜΣΡΟΡ1Κ-Ν1Θ"
  },
  {
   "id": "data4-ath01-paiania",
   "operator": "Data4 Greece Μ.Α.Ε. (Data4 Group)",
   "project": "ATH01 – HERMES Peania campus",
   "site": "Φικ Κόκλι – Πούσι Χατζή Βίλιζα, 74,826 m² plot",
   "municipality": "Παιανίας (borders Κρωπίας, Μαρκοπούλου)",
   "municipality_slug": "paianias",
   "region": "Attica",
   "grid_region": "attica",
   "status": "construction",
   "it_mw": 15,
   "installed_mw": 20,
   "investment_eur": 300000000,
   "investment_note": "€300 M for the first two DCs, third under consideration (tovima 2026-09-28); €500 M plan (businessdaily 2026-09-13); campus masterplan 90 MW / 7.5 ha / two buildings DC1–DC2 (DCD, Data Center Map); first DC 15 MW IT / 20 MW total; address Αγίου Λουκά 33",
   "cooling": "chillers (ΑΕΠΟ 2026 text); design not detailed",
   "water_source": "on-site abstraction points under a Directorate of Waters use licence (ΑΕΠΟ 9ΚΧΧΟΡ1Κ-02Α term 22) plus network",
   "water_m3y": null,
   "water_note": "the one data-centre water-use licence in the warehouse (2,220 m³/yr) sits in Attica — check against this site",
   "strategic_investment": "",
   "timeline": "phase 1 (10 MW total / ~6 MW IT) operational on ΔΕΔΔΗΕ supply (GRDCA 2026-10-08, insider 2026-10-04); phase 2 to 15 MW IT in 2027 pending ΑΔΜΗΕ; DC2 in preliminary design, activation tied to customer contracts; masterplan for units 3–4; ΑΕΠΟ essential modification 2026-06-24 (ΗΠΜ 35678, carrier ΑΦΜ on file)",
   "acts": [
    {
     "ada": "ΨΜ2Μ7Λ7-ΤΨΦ",
     "what": "ΑΕΠΟ, Region of Attica, 15 MW",
     "date": "2024-07-10",
     "url": "https://diavgeia.gov.gr/decision/view/ΨΜ2Μ7Λ7-ΤΨΦ"
    },
    {
     "ada": "9ΚΧΧΟΡ1Κ-02Α",
     "what": "ΑΕΠΟ for the complex, Decentralised Administration",
     "date": "2026-06-11",
     "url": "https://diavgeia.gov.gr/decision/view/9ΚΧΧΟΡ1Κ-02Α"
    },
    {
     "ada": "ΨΓΩ846Ψ842-ΖΔΚ",
     "what": "building permit 1117201/2024, 3rd revision",
     "date": "2026-03-19",
     "url": "https://diavgeia.gov.gr/decision/view/ΨΓΩ846Ψ842-ΖΔΚ"
    },
    {
     "ada": "ΨΖΧΗ46Ψ842-41Α",
     "what": "building permit revision approved",
     "date": "2026-04-22",
     "url": "https://diavgeia.gov.gr/decision/view/ΨΖΧΗ46Ψ842-41Α"
    }
   ],
   "sources": [
    {
     "title": "Data centers: Η Ελλάδα περνά από τις ανακοινώσεις στα MW",
     "publisher": "insider.gr",
     "date": "2026-10-04",
     "url": "https://www.insider.gr/tehnologia/427209/data-centers-i-ellada-perna-apo-tis-anakoinoseis-sta-mw-ta-epomena-orosima"
    },
    {
     "title": "Data centers: Το μεγάλο στοίχημα για την Ελλάδα της Τεχνητής Νοημοσύνης (Advanced Telecoms Summit, 29 Sep 2026)",
     "publisher": "ot.gr",
     "date": "2026-10-03",
     "url": "https://www.ot.gr/2026/10/03/texnologia/data-centers-to-megalo-stoixima-gia-tin-ellada-tis-texnitis-noimosynis"
    },
    {
     "title": "Τα data centers που θα χτιστούν σε ελληνικό έδαφος",
     "publisher": "tanea.gr",
     "date": "2025-03-08",
     "url": "https://www.tanea.gr/2025/03/08/economy/ta-data-centers-pou-tha-xtistoun-se-elliniko-edafos-online/"
    },
    {
     "title": "Η μεγάλη μάχη των data centers: Ποιοι επενδύουν στην Ελλάδα και τι έρχεται (via businessdaily.gr)",
     "publisher": "larissapress.gr",
     "date": "2026-09-13",
     "url": "https://www.larissapress.gr/2026/09/13/i-megali-machi-ton-data-centers-poioi-ependyoun-stin-ellada-kai-ti-erchetai/"
    },
    {
     "title": "GRDCA at Advanced Telecoms Summit 2026: Greece moves from announcements to implementation",
     "publisher": "grdca.gr",
     "date": "2026-10-08",
     "url": "https://grdca.gr/grdca-at-advanced-telecoms-summit-2026-greece-moves-from-announcements-to-implementation/"
    },
    {
     "title": "Greece's AI Data Center Boom Hinges on Finding Enough Power",
     "publisher": "tovima.com",
     "date": "2026-09-28",
     "url": "https://www.tovima.com/finance/greeces-ai-data-center-boom-hinges-on-finding-enough-power/"
    },
    {
     "title": "Data4 plots 90MW data center campus outside Athens, Greece",
     "publisher": "DatacenterDynamics",
     "date": "2024",
     "url": "https://www.datacenterdynamics.com/en/news/data4-plots-90mw-data-center-campus-outside-athens-greece/"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Data Center Map — Athens (21 facilities)",
     "publisher": "datacentermap.com",
     "date": "2026-10-14",
     "url": "https://www.datacentermap.com/greece/athens/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.data4group.com/en/data-center-athens-greece/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.cnn.gr/oikonomia/epixeiriseis/story/449526/data4-ta-sxedia-epektasis-tis-gallikis-etaireias-data-centers-stin-ellada"
    }
   ],
   "legal_entity": "Data 4 Greece ΜΟΝΟΠΡΟΣΩΠΗ ΑΝΩΝΥΜΗ ΕΤΑΙΡΕΙΑ",
   "gemi_url": "https://publicity.businessportal.gr/company/174872101000",
   "address": "Agiou Louka 33 - 190 02 Peania, Greece",
   "floor_m2": "",
   "solomon_status": "UNDER CONSTRUCTION",
   "solomon_mw": "80 MW",
   "lat": 37.9439307,
   "lon": 23.8728233,
   "geo_precision": "exact",
   "eprm_ids": "35678",
   "eprm_adas": "9ΚΧΧΟΡ1Κ-02Α"
  },
  {
   "id": "data-in-scale-spata",
   "operator": "Data in Scale A.E. (ΔΕΗ 45 % / DAMAC EDGNEX 55 %)",
   "project": "Data in Scale Spata",
   "site": "Σπάτα",
   "municipality": "Σπάτων-Αρτέμιδος",
   "municipality_slug": "spaton-artemidos",
   "region": "Attica",
   "grid_region": "attica",
   "status": "permitted",
   "it_mw": 12.5,
   "installed_mw": 25,
   "investment_eur": 150000000,
   "investment_note": "€150 M phase 1 (in.gr 2026-09-19); 12.5 → 25 MW; DCD reports 15.5 MW for the Edgnex Athens site; Solomon: a fourth facility planned closer to the settlement, total >20 MW would cross the ΜΠΕ threshold",
   "cooling": "water-based cooling (powergame 2025-11-27); built by Ten Brinke",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "licensed under ΠΠΔ (<20 MW) without a full ΜΠΕ (Solomon 2026-09-16)",
   "strategic_investment": "",
   "timeline": "building permit 551887/2022 revised for change of owner and use to a data-centre complex (Dec 2025); under construction (Solomon, Data Center Map 2026-10)",
   "acts": [
    {
     "ada": "9ΡΙ846Ψ842-Ι45",
     "what": "building permit 551887/22, 2nd revision — change of owner to Data in Scale, use → data-centre complex",
     "date": "2025-12-04",
     "url": "https://diavgeia.gov.gr/decision/view/9ΡΙ846Ψ842-Ι45"
    }
   ],
   "sources": [
    {
     "title": "Data centers στην Ελλάδα: Οι επενδύσεις, τα έργα και το deal ΔΕΗ με Amazon",
     "publisher": "in.gr",
     "date": "2026-09-19",
     "url": "https://www.in.gr/2026/09/19/economy/data-centers-stin-ellada-oi-ependyseis-ta-erga-kai-to-deal-dei-me-amazon/"
    },
    {
     "title": "ΥΠΕΝ (Αλ. Κουλίδης), Κέντρα Δεδομένων και κατανάλωση νερού στην Ελλάδα — via Solomon",
     "publisher": "ΥΠΕΝ / Solomon",
     "date": "2026-06-20",
     "url": "https://www.documentcloud.org/documents/28651460-upen-solomon-data-centers-ellada-anagkes-se-nero"
    },
    {
     "title": "Τα data centers που θα χτιστούν σε ελληνικό έδαφος",
     "publisher": "tanea.gr",
     "date": "2025-03-08",
     "url": "https://www.tanea.gr/2025/03/08/economy/ta-data-centers-pou-tha-xtistoun-se-elliniko-edafos-online/"
    },
    {
     "title": "Edgnex Data Centers announces 15.5MW data center in Athens, Greece",
     "publisher": "DatacenterDynamics",
     "date": "2025",
     "url": "https://www.datacenterdynamics.com/en/news/edgnex-data-centers-announces-155mw-data-center-in-athens-greece/"
    },
    {
     "title": "Η EDGNEX Data Centers της DAMAC και ο Όμιλος ΔΕΗ (press release PDF)",
     "publisher": "ppcgroup.com",
     "date": "2024",
     "url": "https://www.ppcgroup.com/media/1cqeekgd/h-edgnex-data-centers-ths-damac-kai-o-omilos-deh.pdf"
    },
    {
     "title": "Απέναντι από το Smart Park στα Σπάτα το νέο data center των ΔΕΗ–DAMAC",
     "publisher": "naftemporiki.gr",
     "date": "2025",
     "url": "https://www.naftemporiki.gr/business/1941030/apenanti-apo-to-smart-park-sta-spata-to-neo-data-center-ton-dei-damac/"
    },
    {
     "title": "Φουντώνουν οι αντιδράσεις για το data center των 300 εκατ. της Dromeus Capital στα Σπάτα (Olive)",
     "publisher": "powergame.gr",
     "date": "2025-11-27",
     "url": "https://www.powergame.gr/akinita/1215710/fountonoun-oi-antidraseis-gia-to-data-center-ton-300-ekat-tis-dromeus-capital-sta-spata/"
    },
    {
     "title": "Χωρίς σχέδιο η Ελλάδα για τα data centers (investigation + published site dataset 'Χάρτης Data Centers')",
     "publisher": "Solomon",
     "date": "2026-09-16",
     "url": "https://wearesolomon.com/mag/format-el/erevnes/xoris-sxedio-i-ellada-gia-ta-data-centers/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.ppcgroup.com/media/1cqeekgd/h-edgnex-data-centers-ths-damac-kai-o-omilos-deh.pdf"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.naftemporiki.gr/business/1941030/apenanti-apo-to-smart-park-sta-spata-to-neo-data-center-ton-dei-damac/"
    }
   ],
   "legal_entity": "DATA IN SCALE ΑΝΩΝΥΜΗ ΕΤΑΙΡΙΑ",
   "gemi_url": "https://publicity.businessportal.gr/company/179236501000",
   "address": "https://maps.app.goo.gl/6PSXnAxGxswUyyen7",
   "floor_m2": "",
   "solomon_status": "UNDER CONSTRUCTION",
   "solomon_mw": "12.5 MW",
   "lat": 37.982795,
   "lon": 23.916448,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "digital-realty-ath1-3-koropi",
   "operator": "Digital Realty (ex Lamda Hellix)",
   "project": "Athens 1, 2, 3 — Koropi campus",
   "site": "Ηφαίστου 74–76, Κορωπί",
   "municipality": "Κρωπίας",
   "municipality_slug": "kropias",
   "region": "Attica",
   "grid_region": "attica",
   "status": "operating",
   "it_mw": 9,
   "installed_mw": null,
   "investment_eur": 70000000,
   "investment_note": "ATH1 1 MW / 900 m², ATH2 1.2 MW / 1,100 m², ATH3 6.8 MW / 8,600 m² (Solomon sheet); Athens 3 first phase ~€70 M, built by METLEN; Greek total ~€450 M (in.gr 2026-09-19)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "development-law acts ΨΞΤ346ΜΤΛΡ-6ΓΜ (2020) and 6Ζ007Λ7-51Δ (2022, Κρωπίας)",
   "timeline": "ATH3 hosts the AWS Local Zone (launched Jul 2026)",
   "acts": [
    {
     "ada": "ΨΞΤ346ΜΤΛΡ-6ΓΜ",
     "what": "development-law inclusion, Lamda Hellix",
     "date": "2020-04-10",
     "url": "https://diavgeia.gov.gr/decision/view/ΨΞΤ346ΜΤΛΡ-6ΓΜ"
    },
    {
     "ada": "6Ζ007Λ7-51Δ",
     "what": "development-law inclusion, Region of Attica",
     "date": "2022-06-14",
     "url": "https://diavgeia.gov.gr/decision/view/6Ζ007Λ7-51Δ"
    }
   ],
   "sources": [
    {
     "title": "Data centers στην Ελλάδα: Οι επενδύσεις, τα έργα και το deal ΔΕΗ με Amazon",
     "publisher": "in.gr",
     "date": "2026-09-19",
     "url": "https://www.in.gr/2026/09/19/economy/data-centers-stin-ellada-oi-ependyseis-ta-erga-kai-to-deal-dei-me-amazon/"
    },
    {
     "title": "Τα data centers που θα χτιστούν σε ελληνικό έδαφος",
     "publisher": "tanea.gr",
     "date": "2025-03-08",
     "url": "https://www.tanea.gr/2025/03/08/economy/ta-data-centers-pou-tha-xtistoun-se-elliniko-edafos-online/"
    },
    {
     "title": "Η μεγάλη μάχη των data centers: Ποιοι επενδύουν στην Ελλάδα και τι έρχεται (via businessdaily.gr)",
     "publisher": "larissapress.gr",
     "date": "2026-09-13",
     "url": "https://www.larissapress.gr/2026/09/13/i-megali-machi-ton-data-centers-poioi-ependyoun-stin-ellada-kai-ti-erchetai/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://aws.amazon.com/about-aws/whats-new/2025/03/aws-direct-connect-location-athens-greece/ \""
    }
   ],
   "legal_entity": "DIGITAL REALTY HELLAS ΜΟΝΟΠΡΟΣΩΠΗ Α.Ε.",
   "gemi_url": "https://publicity.businessportal.gr/company/4628501000",
   "address": "Ηφαιστου 74, Κορωπί",
   "floor_m2": "8.600 m²",
   "solomon_status": "OPERATES",
   "solomon_mw": "6,8 MW",
   "lat": 37.87212270000001,
   "lon": 23.8697981,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "digital-realty-ath4",
   "operator": "Digital Realty",
   "project": "Athens 4 (ATH4)",
   "site": "Ηφαίστου 74, Κορωπί — 7,300 m² (Solomon) / 6,200 m² built (Data Center Map)",
   "municipality": "Κρωπίας",
   "municipality_slug": "kropias",
   "region": "Attica",
   "grid_region": "attica",
   "status": "construction",
   "it_mw": 6.8,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "inauguration Oct 2026 (insider) / Nov 2026 (ot.gr)",
   "acts": [],
   "sources": [
    {
     "title": "Data centers: Η Ελλάδα περνά από τις ανακοινώσεις στα MW",
     "publisher": "insider.gr",
     "date": "2026-10-04",
     "url": "https://www.insider.gr/tehnologia/427209/data-centers-i-ellada-perna-apo-tis-anakoinoseis-sta-mw-ta-epomena-orosima"
    },
    {
     "title": "Data centers: Το μεγάλο στοίχημα για την Ελλάδα της Τεχνητής Νοημοσύνης (Advanced Telecoms Summit, 29 Sep 2026)",
     "publisher": "ot.gr",
     "date": "2026-10-03",
     "url": "https://www.ot.gr/2026/10/03/texnologia/data-centers-to-megalo-stoixima-gia-tin-ellada-tis-texnitis-noimosynis"
    },
    {
     "title": "Τα data centers που θα χτιστούν σε ελληνικό έδαφος",
     "publisher": "tanea.gr",
     "date": "2025-03-08",
     "url": "https://www.tanea.gr/2025/03/08/economy/ta-data-centers-pou-tha-xtistoun-se-elliniko-edafos-online/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.digitalrealty.com/data-centers/emea/athens"
    }
   ],
   "legal_entity": "DIGITAL REALTY HELLAS ΜΟΝΟΠΡΟΣΩΠΗ Α.Ε.",
   "gemi_url": "https://publicity.businessportal.gr/company/4628501000",
   "address": "Ηφαιστου 76, Κορωπί 194 00",
   "floor_m2": "7.300 m²",
   "solomon_status": "UNDER CONSTRUCTION",
   "solomon_mw": "6,8 MW",
   "lat": 37.8711469,
   "lon": 23.8707593,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "digital-realty-ath5",
   "operator": "Digital Realty",
   "project": "Athens 5 (ATH5)",
   "site": "Koropi campus (Data Center Map) — land acquired",
   "municipality": "Κρωπίας",
   "municipality_slug": "kropias",
   "region": "Attica",
   "grid_region": "attica",
   "status": "planned",
   "it_mw": 15,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "up to 15 MW IT, 11,000 m² (Solomon / Data Center Map)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "design phase (GRDCA 2026-10-08); preliminary works done; construction could start 2027",
   "acts": [],
   "sources": [
    {
     "title": "Data centers: Η Ελλάδα περνά από τις ανακοινώσεις στα MW",
     "publisher": "insider.gr",
     "date": "2026-10-04",
     "url": "https://www.insider.gr/tehnologia/427209/data-centers-i-ellada-perna-apo-tis-anakoinoseis-sta-mw-ta-epomena-orosima"
    },
    {
     "title": "Data centers: Το μεγάλο στοίχημα για την Ελλάδα της Τεχνητής Νοημοσύνης (Advanced Telecoms Summit, 29 Sep 2026)",
     "publisher": "ot.gr",
     "date": "2026-10-03",
     "url": "https://www.ot.gr/2026/10/03/texnologia/data-centers-to-megalo-stoixima-gia-tin-ellada-tis-texnitis-noimosynis"
    },
    {
     "title": "GRDCA at Advanced Telecoms Summit 2026: Greece moves from announcements to implementation",
     "publisher": "grdca.gr",
     "date": "2026-10-08",
     "url": "https://grdca.gr/grdca-at-advanced-telecoms-summit-2026-greece-moves-from-announcements-to-implementation/"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Data Center Map — Athens (21 facilities)",
     "publisher": "datacentermap.com",
     "date": "2026-10-14",
     "url": "https://www.datacentermap.com/greece/athens/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.digitalrealty.com/data-centers/emea/athens"
    }
   ],
   "legal_entity": "DIGITAL REALTY HELLAS ΜΟΝΟΠΡΟΣΩΠΗ Α.Ε.",
   "gemi_url": "https://publicity.businessportal.gr/company/4628501000",
   "address": "Αθήνα (Αττική)",
   "floor_m2": "11.000 m²",
   "solomon_status": "PLANNING",
   "solomon_mw": "15 MW",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "digital-realty-her1-heraklion",
   "operator": "Digital Realty (Digital Crete 1 Μονοπρόσωπη ΙΚΕ)",
   "project": "Heraklion 1 (HER1)",
   "site": "Ηράκλειο",
   "municipality": "Ηρακλείου",
   "municipality_slug": "irakleiou",
   "region": "Crete",
   "grid_region": "crete",
   "status": "operating",
   "it_mw": 6.5,
   "installed_mw": 10,
   "investment_eur": null,
   "investment_note": "initial 1 MW, expandable to 10 MW, design up to 6.5 MW IT (in.gr); 'expandable to 5 MW' (insider)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "operating since April 2025",
   "acts": [
    {
     "ada": "9ΩΚΝ46Ψ842-ΘΙΘ",
     "what": "building permit — prefabricated DC building (owner Digital Crete 1 IKE)",
     "date": "2024-07-17",
     "url": "https://diavgeia.gov.gr/decision/view/9ΩΚΝ46Ψ842-ΘΙΘ"
    }
   ],
   "sources": [
    {
     "title": "Data centers στην Ελλάδα: Οι επενδύσεις, τα έργα και το deal ΔΕΗ με Amazon",
     "publisher": "in.gr",
     "date": "2026-09-19",
     "url": "https://www.in.gr/2026/09/19/economy/data-centers-stin-ellada-oi-ependyseis-ta-erga-kai-to-deal-dei-me-amazon/"
    },
    {
     "title": "Data centers: Η Ελλάδα περνά από τις ανακοινώσεις στα MW",
     "publisher": "insider.gr",
     "date": "2026-10-04",
     "url": "https://www.insider.gr/tehnologia/427209/data-centers-i-ellada-perna-apo-tis-anakoinoseis-sta-mw-ta-epomena-orosima"
    },
    {
     "title": "Τα data centers που θα χτιστούν σε ελληνικό έδαφος",
     "publisher": "tanea.gr",
     "date": "2025-03-08",
     "url": "https://www.tanea.gr/2025/03/08/economy/ta-data-centers-pou-tha-xtistoun-se-elliniko-edafos-online/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.digitalrealty.com/about/newsroom/press-releases/123317/digital-realty-unveils-first-data-center-in-crete-enhancing-eastern-mediterranean-connectivity"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.digitalrealty.com/data-centers/emea/athens"
    }
   ],
   "legal_entity": "Digital Crete 1 ΜΟΝΟΠΡΟΣΩΠΗ Ι.Κ.Ε.",
   "gemi_url": "https://publicity.businessportal.gr/company/166919301000",
   "address": "https://maps.app.goo.gl/kQzeAfDJfjeR4qxMA",
   "floor_m2": "5010.05 m²",
   "solomon_status": "OPERATES",
   "solomon_mw": "1 MW",
   "lat": 35.318821,
   "lon": 25.173929,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "sparkle-athens-chania",
   "operator": "TI Sparkle (Seabone)",
   "project": "Metamorfosis I (3.2 MW, 4,000 m²) + Metamorfosis II (7.7 MW, 5,831 m²) + Koropi DC (2 MW, 2,580 m²) + Chania DC (0.8 MW, 1,579 m²)",
   "site": "Ερμού 37 & 39 Μεταμόρφωση; Λητούς 13 Κορωπί; Σαρηδαντώνη 23 Χανιά",
   "municipality": "Μεταμορφώσεως / Χανίων",
   "municipality_slug": "",
   "region": "Attica / Crete",
   "grid_region": "attica",
   "status": "operating",
   "it_mw": 13.7,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "13.7 MW across four data centres (in.gr 2026-09-19; per-site MW from the Solomon sheet); Italian state took a 70 % stake in Sparkle",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "development-law completion act ΨΩΘ7465ΧΙ8-9ΝΦ (2019)",
   "timeline": "",
   "acts": [
    {
     "ada": "ΨΩΘ7465ΧΙ8-9ΝΦ",
     "what": "development-law completion, Sparkle",
     "date": "2019-01-24",
     "url": "https://diavgeia.gov.gr/decision/view/ΨΩΘ7465ΧΙ8-9ΝΦ"
    },
    {
     "ada": "Ω8ΦΚ46Ψ842-ΡΒΨ",
     "what": "small-scale works, Metamorfosi DC generators",
     "date": "2021-06-25",
     "url": "https://diavgeia.gov.gr/decision/view/Ω8ΦΚ46Ψ842-ΡΒΨ"
    }
   ],
   "sources": [
    {
     "title": "Data centers στην Ελλάδα: Οι επενδύσεις, τα έργα και το deal ΔΕΗ με Amazon",
     "publisher": "in.gr",
     "date": "2026-09-19",
     "url": "https://www.in.gr/2026/09/19/economy/data-centers-stin-ellada-oi-ependyseis-ta-erga-kai-to-deal-dei-me-amazon/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.tisparkle.com/greece"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.tisparkle.com/sparkle-launches-data-center-metamorfosis-II"
    }
   ],
   "legal_entity": "TI SPARKLE GREECE ΜΟΝΟΠΡΟΣΩΠΗ ΑΝΩΝΥΜΗ ΕΤΑΙΡΕΙΑ ΠΑΡΟΧΗΣ ΤΗΛΕΠΙΚΟΙΝΩΝΙΑΚΩΝ ΥΠΗΡΕΣΙΩΝ Α.Ε.",
   "gemi_url": "https://publicity.businessportal.gr/company/4234701000",
   "address": "Ερμού 39, Μεταμόρφωση",
   "floor_m2": "5.831 m²",
   "solomon_status": "OPERATES",
   "solomon_mw": "7,7 MW",
   "lat": 38.0727638,
   "lon": 23.7743624,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "lancom-balkan-gate-thessaloniki",
   "operator": "Lancom",
   "project": "Balkan Gate (Tier III, carrier-neutral)",
   "site": "Καλοχώρι",
   "municipality": "Δέλτα",
   "municipality_slug": "delta",
   "region": "Central Macedonia",
   "grid_region": "central-macedonia",
   "status": "operating",
   "it_mw": 4,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "4 MW (Solomon sheet); owners Nolis G. 80 % / Nolis S. 20 %",
   "cooling": "AI-assisted cooling claimed for the expansion (powergame 2024-09-27)",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "expansion under way since 2024, flagship (2025–26)",
   "acts": [],
   "sources": [
    {
     "title": "Data centers στην Ελλάδα: Οι επενδύσεις, τα έργα και το deal ΔΕΗ με Amazon",
     "publisher": "in.gr",
     "date": "2026-09-19",
     "url": "https://www.in.gr/2026/09/19/economy/data-centers-stin-ellada-oi-ependyseis-ta-erga-kai-to-deal-dei-me-amazon/"
    },
    {
     "title": "Η μεγάλη μάχη των data centers: Ποιοι επενδύουν στην Ελλάδα και τι έρχεται (via businessdaily.gr)",
     "publisher": "larissapress.gr",
     "date": "2026-09-13",
     "url": "https://www.larissapress.gr/2026/09/13/i-megali-machi-ton-data-centers-poioi-ependyoun-stin-ellada-kai-ti-erchetai/"
    },
    {
     "title": "Τα data centers που θα χτιστούν σε ελληνικό έδαφος",
     "publisher": "tanea.gr",
     "date": "2025-03-08",
     "url": "https://www.tanea.gr/2025/03/08/economy/ta-data-centers-pou-tha-xtistoun-se-elliniko-edafos-online/"
    },
    {
     "title": "Lancom: Επέκταση στην Τουρκία και διπλή επένδυση σε Κρήτη, Θεσσαλονίκη (Heraklion Gate)",
     "publisher": "powergame.gr",
     "date": "2024-09-27",
     "url": "https://www.powergame.gr/start-ups-digital/727640/lancom-epektasi-stin-tourkia-kai-dipli-ependysi-se-kriti-thessaloniki/"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Data Center Map — Thessaloniki (4 facilities)",
     "publisher": "datacentermap.com",
     "date": "2026-10-14",
     "url": "https://www.datacentermap.com/greece/thessaloniki/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.datacenterdynamics.com/en/news/greeces-lancom-adopts-huawei-kit-for-new-balkan-gateway-facility/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://lancom.gr/data-center/"
    }
   ],
   "legal_entity": "LAN COMMUNICATIONS ΕΤΑΙΡΕΙΑ ΠΕΡΙΟΡΙΣΜΕΝΗΣ ΕΥΘΥΝΗΣ",
   "gemi_url": "https://publicity.businessportal.gr/company/43400506000",
   "address": "https://maps.app.goo.gl/3cF8kNPhZ2jbUnFr6",
   "floor_m2": "",
   "solomon_status": "OPERATES",
   "solomon_mw": "4 MW",
   "lat": 40.6572158,
   "lon": 22.8680807,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "synapsecom-athens-ano-liosia",
   "operator": "Synapsecom Telecoms A.E.",
   "project": "SNC-2 Athens Data Center",
   "site": "ΒΙΟ.ΠΑ. Άνω Λιοσίων, 14th Industrial Park St 3",
   "municipality": "Φυλής",
   "municipality_slug": "fylis",
   "region": "Attica",
   "grid_region": "attica",
   "status": "operating",
   "it_mw": 0.5,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "0.5 MW, 2,500 m² (Solomon sheet)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "Data centers στην Ελλάδα: Οι επενδύσεις, τα έργα και το deal ΔΕΗ με Amazon",
     "publisher": "in.gr",
     "date": "2026-09-19",
     "url": "https://www.in.gr/2026/09/19/economy/data-centers-stin-ellada-oi-ependyseis-ta-erga-kai-to-deal-dei-me-amazon/"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Data Center Map — Athens (21 facilities)",
     "publisher": "datacentermap.com",
     "date": "2026-10-14",
     "url": "https://www.datacentermap.com/greece/athens/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.synapsecom.gr/data-centers/thessaloniki-data-center"
    }
   ],
   "legal_entity": "SYNAPSECOM ΑΝΩΝΥΜΗ ΕΤΑΙΡΕΙΑ ΠΑΡΟΧΗΣ ΤΗΛΕΠΙΚΟΙΝΩΝΙΑΚΩΝ ΥΠΗΡΕΣΙΩΝ ΚΑΙ ΥΠΗΡΕΣΙΩΝ INTERNET",
   "gemi_url": "https://publicity.businessportal.gr/company/7455601000",
   "address": "‍3, 14th Industrial Park Street, Ano Liosia, 13341, Athens, Greece",
   "floor_m2": "2.500 m²",
   "solomon_status": "OPERATES",
   "solomon_mw": "0,5 MW",
   "lat": 38.076065,
   "lon": 23.687587999999998,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "synapsecom-thessaloniki-kalochori",
   "operator": "Synapsecom Telecoms A.E.",
   "project": "SNC-1 Thessaloniki Data Center",
   "site": "Πόντου 56, Καλοχώρι / Μενεμένη",
   "municipality": "Δέλτα",
   "municipality_slug": "delta",
   "region": "Central Macedonia",
   "grid_region": "central-macedonia",
   "status": "operating",
   "it_mw": 0.5,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "0.5 MW, 2,500 m² (Solomon sheet)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "Data centers στην Ελλάδα: Οι επενδύσεις, τα έργα και το deal ΔΕΗ με Amazon",
     "publisher": "in.gr",
     "date": "2026-09-19",
     "url": "https://www.in.gr/2026/09/19/economy/data-centers-stin-ellada-oi-ependyseis-ta-erga-kai-to-deal-dei-me-amazon/"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Data Center Map — Thessaloniki (4 facilities)",
     "publisher": "datacentermap.com",
     "date": "2026-10-14",
     "url": "https://www.datacentermap.com/greece/thessaloniki/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.synapsecom.gr/data-centers/athens-data-center"
    }
   ],
   "legal_entity": "SYNAPSECOM ΑΝΩΝΥΜΗ ΕΤΑΙΡΕΙΑ ΠΑΡΟΧΗΣ ΤΗΛΕΠΙΚΟΙΝΩΝΙΑΚΩΝ ΥΠΗΡΕΣΙΩΝ ΚΑΙ ΥΠΗΡΕΣΙΩΝ INTERNET",
   "gemi_url": "https://publicity.businessportal.gr/company/7455601000",
   "address": "‍56 Pontou Street, B KTEO region, Kalochori, 54628, Thessaloniki, Greece",
   "floor_m2": "2.500 m²",
   "solomon_status": "OPERATES",
   "solomon_mw": "0,5 MW",
   "lat": 40.6621735,
   "lon": 22.8653026,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "ppc-aws-agios-dimitrios-kozani",
   "operator": "ΔΕΗ (PPC) with Amazon Web Services",
   "project": "Giga data centre at the Agios Dimitrios lignite plant",
   "site": "ΑΗΣ Αγίου Δημητρίου",
   "municipality": "Κοζάνης",
   "municipality_slug": "kozanis",
   "region": "West Macedonia",
   "grid_region": "west-macedonia",
   "status": "mou",
   "it_mw": 300,
   "installed_mw": 1000,
   "investment_eur": 1200000000,
   "investment_note": "€1.2 bn ΔΕΗ energy + infrastructure phase 1; up to €3.6 bn at 1 GW; AWS IT equipment several bn more",
   "cooling": "closed recirculating loop; extra water only at extreme ambient temperatures (larissapress 2026-09-13)",
   "water_source": "to be defined; the lignite plant's licensed use was 30 M m³/yr (70 M m³/yr basin-wide)",
   "water_m3y": 400000,
   "water_note": "≤ 400,000 m³/yr estimated — 0.6 % of the old lignite requirement (company estimate via press)",
   "strategic_investment": "",
   "timeline": "hyperscaler unnamed to May 2026 (naftemporiki 2026-05-27); AWS partnership and 15-year lease reported Sep 2026 (tovima 2026-09-28, in.gr); construction 2026, commissioning 2027, online 2028 (euro2day); Ptolemaida 5 to convert to ~500 MW closed-cycle gas 'behind the meter' (powergame 2026-03-12); phase-1 total >€7 bn incl. IT (euro2day); ΔΕΗ 2026–30 plan: up to 2 GW of DCs",
   "acts": [],
   "sources": [
    {
     "title": "Data centers στην Ελλάδα: Οι επενδύσεις, τα έργα και το deal ΔΕΗ με Amazon",
     "publisher": "in.gr",
     "date": "2026-09-19",
     "url": "https://www.in.gr/2026/09/19/economy/data-centers-stin-ellada-oi-ependyseis-ta-erga-kai-to-deal-dei-me-amazon/"
    },
    {
     "title": "Η μεγάλη μάχη των data centers: Ποιοι επενδύουν στην Ελλάδα και τι έρχεται (via businessdaily.gr)",
     "publisher": "larissapress.gr",
     "date": "2026-09-13",
     "url": "https://www.larissapress.gr/2026/09/13/i-megali-machi-ton-data-centers-poioi-ependyoun-stin-ellada-kai-ti-erchetai/"
    },
    {
     "title": "Data Centers: Το σχέδιο για να γίνει η Ελλάδα κόμβος, οι mega επενδύσεις",
     "publisher": "powergame.gr",
     "date": "2026-03-12",
     "url": "https://www.powergame.gr/start-ups-digital/1318472/data-centers-to-schedio-gia-na-ginei-i-ellada-komvos-oi-mega-ependyseis/"
    },
    {
     "title": "Greece's AI Data Center Boom Hinges on Finding Enough Power",
     "publisher": "tovima.com",
     "date": "2026-09-28",
     "url": "https://www.tovima.com/finance/greeces-ai-data-center-boom-hinges-on-finding-enough-power/"
    },
    {
     "title": "Επενδύσεις άνω των 5 δισ. έως 2030 για data center και το mega project της ΔΕΗ",
     "publisher": "businessdaily.gr",
     "date": "2026-09-13",
     "url": "https://www.businessdaily.gr/oikonomia/231471_ependyseis-ano-ton-5-dis-eos-2030-gia-data-center-kai-mega-project-tis-dei"
    },
    {
     "title": "Data Center: the 10 billion mega project by PPC–Americans in Kozani",
     "publisher": "euro2day.gr",
     "date": "2026-04",
     "url": "https://www.euro2day.gr/en/article/2352966/data-center-the-10-billion-mega-project-by-ppcamer"
    },
    {
     "title": "Η Κοζάνη περιμένει το data center της ΔΕΗ",
     "publisher": "naftemporiki.gr",
     "date": "2026-05-27",
     "url": "https://www.naftemporiki.gr/business/2115818/i-kozani-perimenei-to-data-center-tis-dei/"
    },
    {
     "title": "Greece heavily invests in AI data centers, often leaving environmental studies aside",
     "publisher": "keeptalkinggreece.com",
     "date": "2026-06-04",
     "url": "https://www.keeptalkinggreece.com/2026/06/04/ai-data-centers-greece-investment/"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    }
   ],
   "legal_entity": "Δημόσια Επιχείρηση Ηλεκτρισμού Ανώνυμη Εταιρεία",
   "gemi_url": "https://publicity.businessportal.gr/company/786301000",
   "address": "https://maps.app.goo.gl/WQFG5YeeLYwcuUeY6",
   "floor_m2": "",
   "solomon_status": "PLANNING",
   "solomon_mw": "1 GW",
   "lat": 40.39305,
   "lon": 21.929981,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "gemini-admie-serverfarm-attica",
   "operator": "Gemini (ΑΔΜΗΕ / IPTO + Serverfarm)",
   "project": "Hyperscale data centres on ΑΔΜΗΕ land",
   "site": "Attica",
   "municipality": "",
   "municipality_slug": "",
   "region": "Attica",
   "grid_region": "attica",
   "status": "planned",
   "it_mw": null,
   "installed_mw": 130,
   "investment_eur": null,
   "investment_note": "up to 130 MW total",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "partnership Dec 2024; ΡΑΑΕΥ raised objections (regulated TSO entering the business); ΑΔΜΗΕ says it continues",
   "acts": [],
   "sources": [
    {
     "title": "IPTO and Serverfarm consortium partner for data center development in Greece",
     "publisher": "ered.gr",
     "date": "2024-12-17",
     "url": "https://ered.gr/real-estate-news/ipto-and-serverfarm-consortium-partner-for-data-center-development-in-greece"
    },
    {
     "title": "Τα data centers που θα χτιστούν σε ελληνικό έδαφος",
     "publisher": "tanea.gr",
     "date": "2025-03-08",
     "url": "https://www.tanea.gr/2025/03/08/economy/ta-data-centers-pou-tha-xtistoun-se-elliniko-edafos-online/"
    },
    {
     "title": "Η μεγάλη μάχη των data centers: Ποιοι επενδύουν στην Ελλάδα και τι έρχεται (via businessdaily.gr)",
     "publisher": "larissapress.gr",
     "date": "2026-09-13",
     "url": "https://www.larissapress.gr/2026/09/13/i-megali-machi-ton-data-centers-poioi-ependyoun-stin-ellada-kai-ti-erchetai/"
    },
    {
     "title": "ΑΔΜΗΕ: Δεν εγκαταλείπει το σχέδιο για το data center παρά το “φρένο” της ΡΑΑΕΥ",
     "publisher": "powergame.gr",
     "date": "",
     "url": "https://www.powergame.gr/energygame/1159339/admie-den-egkataleipei-to-schedio-gia-to-data-center-para-to-freno-tis-raaef/"
    }
   ],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": 38.007829,
   "lon": 23.7153446,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "larissa-data-center",
   "operator": "Larissa Data Center Α.Ε. (with ΔΕΠΑ Εμπορίας and Israeli partners)",
   "project": "Larissa data centre + gas-fired power",
   "site": "Λάρισα",
   "municipality": "Λαρισαίων",
   "municipality_slug": "larisaion",
   "region": "Thessaly",
   "grid_region": "thessaly",
   "status": "announced",
   "it_mw": 200,
   "installed_mw": null,
   "investment_eur": 600000000,
   "investment_note": ">200 MW; €600 M (cnn) / €770 M (keeptalkinggreece 2026-06-04); shareholders Clavenia Ltd (AroundTown-linked) 38.5 %, ΔΕΠΑ Εμπορίας 35 %, EUSIF Larissa 16.5 %, Volton 10 %; paired 792 MW CCGT (FID expected H2 2026)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": 100000,
   "water_note": "~100 million litres (100,000 m³) reported, period not stated (keeptalkinggreece 2026-06-04); ΜέΡΑ25 and local opposition over water and farmland",
   "strategic_investment": "applied for strategic-investment status (press)",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "ΥΠΕΝ (Αλ. Κουλίδης), Κέντρα Δεδομένων και κατανάλωση νερού στην Ελλάδα — via Solomon",
     "publisher": "ΥΠΕΝ / Solomon",
     "date": "2026-06-20",
     "url": "https://www.documentcloud.org/documents/28651460-upen-solomon-data-centers-ellada-anagkes-se-nero"
    },
    {
     "title": "Στρατηγική επένδυση 600 εκατ. ευρώ στη Λάρισα — μονάδα παραγωγής ενέργειας από φυσικό αέριο",
     "publisher": "cnn.gr",
     "date": "",
     "url": "https://www.cnn.gr/oikonomia/anaptyxi/story/477995/stratigiki-ependysi-600-ekat-evro-sti-larisa-monada-paragogis-energeias-apo-fysiko-aerio"
    },
    {
     "title": "Greece heavily invests in AI data centers, often leaving environmental studies aside",
     "publisher": "keeptalkinggreece.com",
     "date": "2026-06-04",
     "url": "https://www.keeptalkinggreece.com/2026/06/04/ai-data-centers-greece-investment/"
    }
   ],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "eunice-bright-data-amyntaio",
   "operator": "Eunice Bright Data Μονοπρόσωπη Α.Ε. (Eunice Energy Group)",
   "project": "Amyntaio data centre",
   "site": "Αμύνταιο, Π.Ε. Φλώρινας",
   "municipality": "Αμυνταίου",
   "municipality_slug": "amyntaiou",
   "region": "West Macedonia",
   "grid_region": "west-macedonia",
   "status": "permitted",
   "it_mw": 5,
   "installed_mw": 8,
   "investment_eur": null,
   "investment_note": "",
   "cooling": "per technical report filed with the ΠΠΔ (not in act text)",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "ΠΠΔ (standard environmental commitments) 2025-11-17",
   "acts": [
    {
     "ada": "9ΝΡΓ7ΛΨ-ΓΚ7",
     "what": "ΠΠΔ, Region of West Macedonia",
     "date": "2025-11-17",
     "url": "https://diavgeia.gov.gr/decision/view/9ΝΡΓ7ΛΨ-ΓΚ7"
    }
   ],
   "sources": [
    {
     "title": "Τα data centers που θα χτιστούν σε ελληνικό έδαφος",
     "publisher": "tanea.gr",
     "date": "2025-03-08",
     "url": "https://www.tanea.gr/2025/03/08/economy/ta-data-centers-pou-tha-xtistoun-se-elliniko-edafos-online/"
    }
   ],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "gnwsis-amyntaio",
   "operator": "GNWSIS Data Center Solutions Μ.Ι.Κ.Ε.",
   "project": "Amyntaio data centre (plot 137)",
   "site": "Αμύνταιο, 17,250 m² plot",
   "municipality": "Αμυνταίου",
   "municipality_slug": "amyntaiou",
   "region": "West Macedonia",
   "grid_region": "west-macedonia",
   "status": "permitted",
   "it_mw": 5,
   "installed_mw": 10,
   "investment_eur": null,
   "investment_note": "5 MW IT, 10 MW total incl. cooling and support (ΠΠΔ text)",
   "cooling": "not detailed in act",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "ΠΠΔ 2026-03-19",
   "acts": [
    {
     "ada": "ΡΤΓΘ7ΛΨ-ΘΣΩ",
     "what": "ΠΠΔ, Region of West Macedonia",
     "date": "2026-03-19",
     "url": "https://diavgeia.gov.gr/decision/view/ΡΤΓΘ7ΛΨ-ΘΣΩ"
    }
   ],
   "sources": [],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "gnwsis-megalopoli",
   "operator": "GNWSIS Data Center Solutions Μ.Α.Ε. (KIEFER TEK ΕΠΕ named in the permit)",
   "project": "Megalopoli 1 and 2",
   "site": "Λεοντάρι, Δ.Ε. Φαλαισίας, θέση Κάμπος",
   "municipality": "Μεγαλόπολης",
   "municipality_slug": "megalopolis",
   "region": "Peloponnese",
   "grid_region": "peloponnese",
   "status": "permitted",
   "it_mw": null,
   "installed_mw": 19.8,
   "investment_eur": null,
   "investment_note": "two buildings of 9.9 MW each (building permits Oct 2026); KIEFER reports 1.2 MW → 10 MW AI GPU capacity at Megalopoli, Q1 2027 (insider 2026-10-04)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "entry–exit approval 2026-09-30; building permits 2026-10-02; operation early 2027 (Kiefer, ot.gr)",
   "acts": [
    {
     "ada": "9ΧΠ8ΩΛ8-ΔΒΚ",
     "what": "entry–exit approval, Megalopoli municipality",
     "date": "2026-09-30",
     "url": "https://diavgeia.gov.gr/decision/view/9ΧΠ8ΩΛ8-ΔΒΚ"
    },
    {
     "ada": "Ψ7ΗΞ46Ψ842-ΑΔΥ",
     "what": "building permit, Megalopoli 1, 9.9 MW",
     "date": "2026-10-02",
     "url": "https://diavgeia.gov.gr/decision/view/Ψ7ΗΞ46Ψ842-ΑΔΥ"
    },
    {
     "ada": "ΨΖΨΡ46Ψ842-2ΣΞ",
     "what": "building permit, Megalopoli 2, 9.9 MW",
     "date": "2026-10-02",
     "url": "https://diavgeia.gov.gr/decision/view/ΨΖΨΡ46Ψ842-2ΣΞ"
    }
   ],
   "sources": [
    {
     "title": "Data centers: Η Ελλάδα περνά από τις ανακοινώσεις στα MW",
     "publisher": "insider.gr",
     "date": "2026-10-04",
     "url": "https://www.insider.gr/tehnologia/427209/data-centers-i-ellada-perna-apo-tis-anakoinoseis-sta-mw-ta-epomena-orosima"
    },
    {
     "title": "Data centers: Το μεγάλο στοίχημα για την Ελλάδα της Τεχνητής Νοημοσύνης (Advanced Telecoms Summit, 29 Sep 2026)",
     "publisher": "ot.gr",
     "date": "2026-10-03",
     "url": "https://www.ot.gr/2026/10/03/texnologia/data-centers-to-megalo-stoixima-gia-tin-ellada-tis-texnitis-noimosynis"
    }
   ],
   "legal_entity": "GNWSIS DATA CENTER SOLUTIONS ΜΟΝΟΠΡΟΣΩΠΗ Α.Ε.",
   "gemi_url": "https://publicity.businessportal.gr/company/182808718000",
   "address": "Λεονταρίου, Μεγαλόπολη",
   "floor_m2": "",
   "solomon_status": "PLANNING",
   "solomon_mw": "9,9 MW",
   "lat": 37.3954561,
   "lon": 22.1406461,
   "geo_precision": "area",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "kiefer-marousi",
   "operator": "KIEFER",
   "project": "AI data hall, Marousi",
   "site": "Μαρούσι",
   "municipality": "Αμαρουσίου",
   "municipality_slug": "amarousiou",
   "region": "Attica",
   "grid_region": "attica",
   "status": "operating",
   "it_mw": 0.7,
   "installed_mw": null,
   "investment_eur": 150000000,
   "investment_note": "€150 M AI-ecosystem plan over two years (businessdaily 2026-09-13); 700 kW hall operating ~1 year; Megalopoli GPU cluster 1.2 MW phase 1 (Q1 2027) → up to 10 MW sits in the GNWSIS Megalopoli buildings (insider 2026-10-04)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "Data centers: Η Ελλάδα περνά από τις ανακοινώσεις στα MW",
     "publisher": "insider.gr",
     "date": "2026-10-04",
     "url": "https://www.insider.gr/tehnologia/427209/data-centers-i-ellada-perna-apo-tis-anakoinoseis-sta-mw-ta-epomena-orosima"
    },
    {
     "title": "Η μεγάλη μάχη των data centers: Ποιοι επενδύουν στην Ελλάδα και τι έρχεται (via businessdaily.gr)",
     "publisher": "larissapress.gr",
     "date": "2026-09-13",
     "url": "https://www.larissapress.gr/2026/09/13/i-megali-machi-ton-data-centers-poioi-ependyoun-stin-ellada-kai-ti-erchetai/"
    }
   ],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "team-fortress-ioannina",
   "operator": "Team Fortress Μονοπρόσωπη ΙΚΕ",
   "project": "ΒΙ.ΠΕ. Ioannina data centre (Ο.Τ. 5)",
   "site": "ΒΙ.ΠΕ. Ιωαννίνων",
   "municipality": "Ζίτσας",
   "municipality_slug": "zitsas",
   "region": "Epirus",
   "grid_region": "epirus",
   "status": "permitted",
   "it_mw": null,
   "installed_mw": 10,
   "investment_eur": null,
   "investment_note": "10 MW (Solomon 2026-09-16); residents asked for energy and water figures, none published",
   "cooling": "technical report on cooling filed (not in act text)",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "ΠΠΔ 2025-12-15",
   "acts": [
    {
     "ada": "9ΟΑ37Λ9-2Ι5",
     "what": "ΠΠΔ, Region of Epirus",
     "date": "2025-12-15",
     "url": "https://diavgeia.gov.gr/decision/view/9ΟΑ37Λ9-2Ι5"
    }
   ],
   "sources": [
    {
     "title": "Χωρίς σχέδιο η Ελλάδα για τα data centers (investigation + published site dataset 'Χάρτης Data Centers')",
     "publisher": "Solomon",
     "date": "2026-09-16",
     "url": "https://wearesolomon.com/mag/format-el/erevnes/xoris-sxedio-i-ellada-gia-ta-data-centers/"
    }
   ],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "cloudecore-ioannina",
   "operator": "Cloudecore A.E.",
   "project": "ΒΙ.ΠΕ. Ioannina data centre (Ο.Τ. 2γ, Ροδοτόπι)",
   "site": "ΒΙ.ΠΕ. Ιωαννίνων, Τ.Κ. Ροδοτοπίου",
   "municipality": "Ζίτσας",
   "municipality_slug": "zitsas",
   "region": "Epirus",
   "grid_region": "epirus",
   "status": "permitted",
   "it_mw": null,
   "installed_mw": 19.5,
   "investment_eur": null,
   "investment_note": "19.5 MW (Solomon 2026-09-16)",
   "cooling": "technical report on cooling filed (not in act text)",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "ΠΠΔ 2026-05-12",
   "acts": [
    {
     "ada": "ΡΠ9Ε7Λ9-89Ο",
     "what": "ΠΠΔ, Region of Epirus",
     "date": "2026-05-12",
     "url": "https://diavgeia.gov.gr/decision/view/ΡΠ9Ε7Λ9-89Ο"
    }
   ],
   "sources": [
    {
     "title": "Χωρίς σχέδιο η Ελλάδα για τα data centers (investigation + published site dataset 'Χάρτης Data Centers')",
     "publisher": "Solomon",
     "date": "2026-09-16",
     "url": "https://wearesolomon.com/mag/format-el/erevnes/xoris-sxedio-i-ellada-gia-ta-data-centers/"
    }
   ],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "ote-thermopyles-molos",
   "operator": "ΟΤΕ Ακίνητα Α.Ε. (OTE Group)",
   "project": "Data centre 'Θερμοπύλες'",
   "site": "Δ.Ε. Μώλου, εκτός σχεδίου",
   "municipality": "Καμένων Βούρλων",
   "municipality_slug": "kamenon-vourlon",
   "region": "Central Greece",
   "grid_region": "sterea-ellada",
   "status": "permitted",
   "it_mw": 5,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "5 MW (ΠΠΔ and building-permit pre-approval)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "building-permit pre-approval 2025-12-22; ΠΠΔ 2026-01-20",
   "acts": [
    {
     "ada": "Ψ98746Ψ842-1ΡΩ",
     "what": "building-permit pre-approval, 5 MW (owner ΟΤΕ Ακίνητα)",
     "date": "2025-12-22",
     "url": "https://diavgeia.gov.gr/decision/view/Ψ98746Ψ842-1ΡΩ"
    },
    {
     "ada": "ΡΚΨΑ7ΛΗ-5ΨΜ",
     "what": "ΠΠΔ, Region of Central Greece",
     "date": "2026-01-20",
     "url": "https://diavgeia.gov.gr/decision/view/ΡΚΨΑ7ΛΗ-5ΨΜ"
    }
   ],
   "sources": [],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "resilientcore-evros",
   "operator": "Resilientcore S.A.",
   "project": "Data centre, 19.5 MW installed",
   "site": "ΒΙ.ΠΕ., Π.Ε. Έβρου",
   "municipality": "",
   "municipality_slug": "",
   "region": "East Macedonia & Thrace",
   "grid_region": "east-macedonia-thrace",
   "status": "permitted",
   "it_mw": 12,
   "installed_mw": 19.5,
   "investment_eur": null,
   "investment_note": "19.5 MW installed; 12 MW figure also in the act (likely IT)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "ΠΠΔ 2026-05-08",
   "acts": [
    {
     "ada": "Ψ7ΨΥ7ΛΒ-ΣΘΔ",
     "what": "ΠΠΔ, Region of East Macedonia & Thrace",
     "date": "2026-05-08",
     "url": "https://diavgeia.gov.gr/decision/view/Ψ7ΨΥ7ΛΒ-ΣΘΔ"
    }
   ],
   "sources": [],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "white-aquila-kastoria",
   "operator": "White Aquila Energy and … ΙΚΕ (ΒΙ.ΠΑ. Καστοριάς)",
   "project": "Two 9.9 MW data-centre buildings",
   "site": "ΒΙ.ΠΑ. Καστοριάς, Άργος Ορεστικό",
   "municipality": "Καστοριάς",
   "municipality_slug": "kastorias",
   "region": "West Macedonia",
   "grid_region": "west-macedonia",
   "status": "permitted",
   "it_mw": null,
   "installed_mw": 19.8,
   "investment_eur": 26660000,
   "investment_note": "2 × 9.9 MW building permits; €26.66 M (Kastoria News via Solomon)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "earlier 10 MW building permit 2025-12-30 (ΨΦ8346Ψ842-ΝΕΤ, Solomon permits); building permits 2026-07-22",
   "acts": [
    {
     "ada": "9ΗΧΜ46Ψ842-ΥΒ6",
     "what": "building permit, 9.9 MW",
     "date": "2026-07-22",
     "url": "https://diavgeia.gov.gr/decision/view/9ΗΧΜ46Ψ842-ΥΒ6"
    },
    {
     "ada": "Ψ1ΝΜ46Ψ842-Ζ3Δ",
     "what": "building permit, 9.9 MW",
     "date": "2026-07-22",
     "url": "https://diavgeia.gov.gr/decision/view/Ψ1ΝΜ46Ψ842-Ζ3Δ"
    },
    {
     "ada": "ΨΦ8346Ψ842-ΝΕΤ",
     "what": "building permit, 10 MW data-centre building",
     "date": "2025-12-30",
     "url": "https://diavgeia.gov.gr/decision/view/ΨΦ8346Ψ842-ΝΕΤ"
    }
   ],
   "sources": [
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Data center στην Καστοριά: Επένδυση 26,66 εκατ. ευρώ",
     "publisher": "Kastoria News",
     "date": "2026",
     "url": ""
    }
   ],
   "legal_entity": "White Aquila Energy and Infrastructure ΙΔΙΩΤΙΚΗ ΚΕΦΑΛΑΙΟΥΧΙΚΗ ΕΤΑΙΡΕΙΑ",
   "gemi_url": "https://publicity.businessportal.gr/company/194314701000",
   "address": "Άργος Ορεστικό, Καστοριά",
   "floor_m2": "",
   "solomon_status": "PLANNING",
   "solomon_mw": "9,9 MW",
   "lat": 40.3926446,
   "lon": 21.2010383,
   "geo_precision": "area",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "radiant-kryoneri-dionysos",
   "operator": "Radiant Data Centre Μ.Α.Ε. (DAMAC / Edgnex vehicle, with ΔΕΗ per Solomon; contractor Tentec)",
   "project": "DAMAC Kryoneri data-centre complex",
   "site": "Λεωφ. Κρυονερίου 118, Κρυονέρι",
   "municipality": "Διονύσου",
   "municipality_slug": "dionysou",
   "region": "Attica",
   "grid_region": "attica",
   "status": "permitted",
   "it_mw": 12.5,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "12.5 MW IT; ΡΑΑΕΥ–ΑΔΜΗΕ dispute over its grid connection reported (powergame)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "pre-approval 2026-05-12; excavation permit 2026-05-15; building permit 2026-09-09",
   "acts": [
    {
     "ada": "Ρ41Ω46Ψ842-Ο5Τ",
     "what": "building-permit pre-approval, 12.5 MW IT",
     "date": "2026-05-12",
     "url": "https://diavgeia.gov.gr/decision/view/Ρ41Ω46Ψ842-Ο5Τ"
    },
    {
     "ada": "908Υ46Ψ842-Μ4Υ",
     "what": "excavation permit",
     "date": "2026-05-15",
     "url": "https://diavgeia.gov.gr/decision/view/908Υ46Ψ842-Μ4Υ"
    },
    {
     "ada": "9ΤΒΞ46Ψ842-ΩΚΒ",
     "what": "building permit, 12.5 MW IT",
     "date": "2026-09-09",
     "url": "https://diavgeia.gov.gr/decision/view/9ΤΒΞ46Ψ842-ΩΚΒ"
    }
   ],
   "sources": [
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "UAE tycoon expands into Greece with new data center company (Radiant Data Centre)",
     "publisher": "dnews.gr",
     "date": "2025",
     "url": "https://www.dnews.gr/eidhseis/news-in-english/530200/uae-tycoon-expands-into-greece-with-new-data-center-company"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.dnews.gr/eidhseis/news-in-english/530200/uae-tycoon-expands-into-greece-with-new-data-center-company"
    }
   ],
   "legal_entity": "RADIANT DATA CENTRE ΜΟΝΟΠΡΟΣΩΠΗ Α.Ε.",
   "gemi_url": "https://publicity.businessportal.gr/company/180780101000",
   "address": "ΛΕΩΦΟΡΟΣ ΚΡΥΟΝΕΡΙΟΥ 118",
   "floor_m2": "",
   "solomon_status": "PLANNING",
   "solomon_mw": "12.5 MW",
   "lat": 38.1393051,
   "lon": 23.8397858,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "vodafone-tympaki",
   "operator": "Vodafone-Panafon",
   "project": "Tympaki DC",
   "site": "Τυμπάκι",
   "municipality": "Φαιστού",
   "municipality_slug": "faistou",
   "region": "Crete",
   "grid_region": "crete",
   "status": "construction",
   "it_mw": null,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "",
   "cooling": "not published",
   "water_source": "not published — sits on the over-drawn Messara aquifers (WFD poor bodies EL1300081–83)",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "building permit 2023-12-04; addition of two data-centre buildings, offices, warehouse permitted 2026-02-17",
   "acts": [
    {
     "ada": "6ΑΛΗ46Ψ842-ΤΝΗ",
     "what": "building-permit pre-approval, Tympaki DC",
     "date": "2023-11-09",
     "url": "https://diavgeia.gov.gr/decision/view/6ΑΛΗ46Ψ842-ΤΝΗ"
    },
    {
     "ada": "6Ω6Α46Ψ842-ΧΤΟ",
     "what": "building permit",
     "date": "2023-12-04",
     "url": "https://diavgeia.gov.gr/decision/view/6Ω6Α46Ψ842-ΧΤΟ"
    },
    {
     "ada": "90ΗΧ46Ψ842-ΑΡΘ",
     "what": "building permit, extension (2 buildings)",
     "date": "2026-02-17",
     "url": "https://diavgeia.gov.gr/decision/view/90ΗΧ46Ψ842-ΑΡΘ"
    }
   ],
   "sources": [],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "aws-local-zone-athens",
   "operator": "Amazon Web Services",
   "project": "AWS Local Zone Athens (hosted in Digital Realty ATH3)",
   "site": "Κορωπί",
   "municipality": "Κρωπίας",
   "municipality_slug": "kropias",
   "region": "Attica",
   "grid_region": "attica",
   "status": "operating",
   "it_mw": null,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "launched July 2026, five years after announcement",
   "acts": [],
   "sources": [
    {
     "title": "Η μεγάλη μάχη των data centers: Ποιοι επενδύουν στην Ελλάδα και τι έρχεται (via businessdaily.gr)",
     "publisher": "larissapress.gr",
     "date": "2026-09-13",
     "url": "https://www.larissapress.gr/2026/09/13/i-megali-machi-ton-data-centers-poioi-ependyoun-stin-ellada-kai-ti-erchetai/"
    },
    {
     "title": "Τα data centers που θα χτιστούν σε ελληνικό έδαφος",
     "publisher": "tanea.gr",
     "date": "2025-03-08",
     "url": "https://www.tanea.gr/2025/03/08/economy/ta-data-centers-pou-tha-xtistoun-se-elliniko-edafos-online/"
    }
   ],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "google-cloud-region",
   "operator": "Google",
   "project": "Google Cloud region (three centres)",
   "site": "northern Athens suburbs reported (cnn 2024-09-12); Solomon geocodes it to Penteli",
   "municipality": "",
   "municipality_slug": "",
   "region": "Attica",
   "grid_region": "attica",
   "status": "announced",
   "it_mw": 40,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "announced autumn 2022; phased 5–6 MW → 40 MW depending on demand (cnn 2024-09-12); no reported progress by 2026 — 'stalled' (businessdaily 2026-09-13); press links it to the Gemini (ΑΔΜΗΕ/Serverfarm) sites",
   "acts": [],
   "sources": [
    {
     "title": "Τα data centers που θα χτιστούν σε ελληνικό έδαφος",
     "publisher": "tanea.gr",
     "date": "2025-03-08",
     "url": "https://www.tanea.gr/2025/03/08/economy/ta-data-centers-pou-tha-xtistoun-se-elliniko-edafos-online/"
    },
    {
     "title": "Η μεγάλη μάχη των data centers: Ποιοι επενδύουν στην Ελλάδα και τι έρχεται (via businessdaily.gr)",
     "publisher": "larissapress.gr",
     "date": "2026-09-13",
     "url": "https://www.larissapress.gr/2026/09/13/i-megali-machi-ton-data-centers-poioi-ependyoun-stin-ellada-kai-ti-erchetai/"
    },
    {
     "title": "Data Centers: Oι λόγοι που η Ελλάδα προσελκύει μεγάλες επενδύσεις (Google 5–6 → 40 MW, UAE MoU 500 MW)",
     "publisher": "cnn.gr",
     "date": "2024-09-12",
     "url": "https://www.cnn.gr/oikonomia/anaptyxi/story/438662/data-centers-oi-logoi-pou-i-ellada-proselkyei-megales-ependyseis"
    },
    {
     "title": "Επενδύσεις άνω των 5 δισ. έως 2030 για data center και το mega project της ΔΕΗ",
     "publisher": "businessdaily.gr",
     "date": "2026-09-13",
     "url": "https://www.businessdaily.gr/oikonomia/231471_ependyseis-ano-ton-5-dis-eos-2030-gia-data-center-kai-mega-project-tis-dei"
    }
   ],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": 38.0457568,
   "lon": 23.8584737,
   "geo_precision": "area",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "militos-aspropyrgos",
   "operator": "Μίλητος Κτηματική Μ.Α.Ε. (owner of record)",
   "project": "Three prefabricated DC buildings",
   "site": "Ασπρόπυργος",
   "municipality": "Ασπροπύργου",
   "municipality_slug": "aspropyrgou",
   "region": "Attica",
   "grid_region": "attica",
   "status": "permitted",
   "it_mw": null,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "building-permit pre-approval 2023-01-13",
   "acts": [
    {
     "ada": "9Β8Α46Ψ842-Ψ4Σ",
     "what": "building-permit pre-approval, three prefab DC buildings",
     "date": "2023-01-13",
     "url": "https://diavgeia.gov.gr/decision/view/9Β8Α46Ψ842-Ψ4Σ"
    }
   ],
   "sources": [],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "tanagra-thiva-dc",
   "operator": "not identified in the act",
   "project": "Data-centre building, Tanagra/Thiva",
   "site": "",
   "municipality": "Τανάγρας / Θηβαίων",
   "municipality_slug": "tanagras",
   "region": "Central Greece",
   "grid_region": "sterea-ellada",
   "status": "permitted",
   "it_mw": null,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "building-permit pre-approval 2026-05-04",
   "acts": [
    {
     "ada": "9ΨΦ446Ψ842-ΓΩΡ",
     "what": "building-permit pre-approval",
     "date": "2026-05-04",
     "url": "https://diavgeia.gov.gr/decision/view/9ΨΦ446Ψ842-ΓΩΡ"
    }
   ],
   "sources": [],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "karatzis-orchomenos-boeotia",
   "operator": "Καράτζη Βιομηχανικές & Ξενοδοχειακές Επιχειρήσεις Μ.Α.Ε. (Karatzis Group)",
   "project": "Ampelia campus — seven data-centre buildings",
   "site": "Αμπέλια, Κάστρο, Ορχομενός (2 km N of Kastro, off PATHE), 342,465 m²",
   "municipality": "Ορχομενού",
   "municipality_slug": "orchomenou",
   "region": "Central Greece",
   "grid_region": "sterea-ellada",
   "status": "announced",
   "it_mw": null,
   "installed_mw": 430.43,
   "investment_eur": 240000000,
   "investment_note": "430.43 MW total load (7 × 61.49 MW); €240 M; financing equity + loans + grants (DCD 2026-03-06)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "site-selection and environmental studies begun 2025; 18-month build in three stages; the 'Larymna 200 MW' ΑΔΜΗΕ request (news247 2025-12-15) sits in the same Boeotia/Larymna grid area — not confirmed as this project",
   "acts": [],
   "sources": [
    {
     "title": "Karatzis Group to build €240m data center in Boeotia, Greece",
     "publisher": "DatacenterDynamics",
     "date": "2026-03-06",
     "url": "https://www.datacenterdynamics.com/en/news/karatzis-group-to-build-240m-data-center-in-boeotia-greece/"
    },
    {
     "title": "Αντώνης Καράτζης: Επένδυση 240 εκατ. ευρώ σε Data Center στη Βοιωτία",
     "publisher": "mononews.gr",
     "date": "2026-03",
     "url": "https://www.mononews.gr/business/antonis-karatzis-ependysi-240-ekat-evro-se-data-center-sti-voiotia"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.mononews.gr/business/antonis-karatzis-ependysi-240-ekat-evro-se-data-center-sti-voiotia"
    }
   ],
   "legal_entity": "ΚΑΡΑΤΖΗ ΒΙΟΜΗΧΑΝΙΚΕΣ & ΞΕΝΟΔΟΧΕΙΑΚΕΣ ΕΠΙΧΕΙΡΗΣΕΙΣ ΜΟΝΟΠΡΟΣΩΠΗ ΑΝΩΝΥΜΗ ΕΤΑΙΡΕΙΑ",
   "gemi_url": "https://publicity.businessportal.gr/company/77088427000",
   "address": "Κάστρο, Ορχομενός, Βοιωτία",
   "floor_m2": "",
   "solomon_status": "PLANNING",
   "solomon_mw": "430.43 MW",
   "lat": 38.4937481,
   "lon": 23.1602932,
   "geo_precision": "area",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "karatzis-tectum-kryoneri",
   "operator": "Καράτζη Βιομηχανικές & Ξενοδοχειακές Επιχειρήσεις Μ.Α.Ε.; original ΠΠΔ holder Tectum Αναπτυξιακή Μ.Α.Ε.",
   "project": "Kryoneri data centre, 'Βαρίκα / Βασιλική Πόρτα' plot (Λεύκης 109–131)",
   "site": "Κρυονέρι, 32,800 m² plot, 18,082 m² floor",
   "municipality": "Διονύσου",
   "municipality_slug": "dionysou",
   "region": "Attica",
   "grid_region": "attica",
   "status": "planned",
   "it_mw": 26.09,
   "installed_mw": 39.072,
   "investment_eur": 32500000,
   "investment_note": "ΜΠΕ for 39.072 MW (26.09 MW IT + 12.98 MW E/M), €32.5 M; the earlier 19.53 MW design had ΠΠΔ under Tectum (Attica Region decision 1329/2026-05-04); max 342,516 MWh/yr",
   "cooling": "closed-loop, air-cooled chillers; Tier III (IV possible); AI-ready high-density cooling",
   "water_source": "mains; initial fill ~145 m³, top-up ~6 m³/yr",
   "water_m3y": 3185,
   "water_note": "~3,185 m³/yr total (ΜΠΕ via newmoney 2026-10-06)",
   "strategic_investment": "",
   "timeline": "ΜΠΕ in public consultation to 2026-11-17; 18-month build; ~35 staff; Dionysos council convened on both Kryoneri DCs",
   "acts": [
    {
     "ada": "ΡΤΥ846Ψ842-ΩΝΗ",
     "what": "building-permit pre-approval, data-management building, Kryoneri (Tectum)",
     "date": "2026-07-08",
     "url": "https://diavgeia.gov.gr/decision/view/ΡΤΥ846Ψ842-ΩΝΗ"
    }
   ],
   "sources": [
    {
     "title": "Επένδυση €32,5 εκατ. για data center στο Κρυονέρι από τον όμιλο Καράτζη εν μέσω τοπικών αντιδράσεων (ΜΠΕ in consultation to 2026-11-17)",
     "publisher": "newmoney.gr",
     "date": "2026-10-06",
     "url": "https://www.newmoney.gr/roh/palmos-oikonomias/ependyseis/ependisi-e325-ekat-gia-data-center-sto-krioneri-apo-ton-omilo-karatzi-en-meso-topikon-antidraseon-chartis/"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    }
   ],
   "legal_entity": "TECTUM ΑΝΑΠΤΥΞΙΑΚΗ ΜΟΝΟΠΡΟΣΩΠΗ Α.Ε. ΕΤΑΙΡΕΙΑ",
   "gemi_url": "https://publicity.businessportal.gr/company/132327301000",
   "address": "ΛΕΥΚΗΣ 109, Κρυονέρι",
   "floor_m2": "",
   "solomon_status": "PLANNING",
   "solomon_mw": "20 MW",
   "lat": 38.1433488,
   "lon": 23.8421544,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "biotech-park-korinthia-lechaio",
   "operator": "Βιοτεχνολογικό Πάρκο Κορινθίας Α.Ε. (E. Mandrekas)",
   "project": "Data Center Korinthia",
   "site": "Λέχαιο Κορινθίας, Παλαιά Ε.Ο. Κορίνθου–Πατρών 165",
   "municipality": "Κορινθίων",
   "municipality_slug": "korinthion",
   "region": "Peloponnese",
   "grid_region": "peloponnese",
   "status": "planned",
   "it_mw": null,
   "installed_mw": 6,
   "investment_eur": null,
   "investment_note": "6 MW (Solomon sheet); PwC maps ~40–80 MW of interest at Corinth and ΑΔΜΗΕ a 40 MW final connection offer in Corinthia — operator of that 40 MW not published",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "Το τρένο της AI σφυρίζει στο Λέχαιο Κορινθίας",
     "publisher": "naftemporiki.gr",
     "date": "2025-11",
     "url": "https://www.naftemporiki.gr/business/2035696/to-treno-tis-ai-sfyrizei-sto-lechaio-korinthias/"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "PwC για ΥΨΔ: Συνοπτικά συμπεράσματα μελέτης για τη χωροθέτηση των data centers στην Ελλάδα (PDF, sources/)",
     "publisher": "PwC / Ministry of Digital Governance via ot.gr",
     "date": "2026-03-13",
     "url": "https://www.ot.gr/wp-content/uploads/2026/03/Δείτε-εδώ-τα-βασικά-συμπεράσματα-της-έκθεσης.pdf"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.naftemporiki.gr/business/2035696/to-treno-tis-ai-sfyrizei-sto-lechaio-korinthias/"
    }
   ],
   "legal_entity": "ΒΙΟΤΕΧΝΟΛΟΓΙΚΟ ΠΑΡΚΟ ΚΟΡΙΝΘΙΑΣ ΑΝΩΝΥΜΗ ΕΤΑΙΡΕΙΑ",
   "gemi_url": "https://publicity.businessportal.gr/company/166759137000",
   "address": "ΛΕΧΑΙΟ ΚΟΡΙΝΘΙΑΣ, 20011",
   "floor_m2": "",
   "solomon_status": "PLANNING",
   "solomon_mw": "6 MW",
   "lat": 37.9346483,
   "lon": 22.8455989,
   "geo_precision": "area",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "cloudrock-cr1-agios-stefanos",
   "operator": "CloudRock S.A. (Cloud Rock 1 Α.Ε.)",
   "project": "CR1",
   "site": "Θουκυδίδου 4, Άγιος Στέφανος",
   "municipality": "Διονύσου",
   "municipality_slug": "dionysou",
   "region": "Attica",
   "grid_region": "attica",
   "status": "operating",
   "it_mw": null,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "CloudRock δημιούργησε ιδιόκτητο data center στον Άγιο Στέφανο",
     "publisher": "netweek.gr",
     "date": "",
     "url": "https://netweek.gr/cloudrock-dimiourgise-idioktito-data-center-ston-agio-stefano/"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Data Center Map — Athens (21 facilities)",
     "publisher": "datacentermap.com",
     "date": "2026-10-14",
     "url": "https://www.datacentermap.com/greece/athens/"
    },
    {
     "title": "Greece Colocation Data Center Portfolio Report 2025: 17 existing, 5 upcoming, 12 operators (names only in the release)",
     "publisher": "ResearchAndMarkets via GlobeNewswire",
     "date": "2026-01-06",
     "url": "https://www.globenewswire.com/fr/news-release/2026/01/06/3213368/0/en/Greece-Colocation-Data-Center-Portfolio-Report-2025-Detailed-Analysis-of-17-Existing-Data-Centers-5-Upcoming-Data-Centers-and-12-Major-Operators-Investors.html"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://netweek.gr/cloudrock-dimiourgise-idioktito-data-center-ston-agio-stefano/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://cloudrock.gr/data-center/"
    }
   ],
   "legal_entity": "CLOUD ROCK 1 ΑΝΩΝΥΜΗ ΕΤΑΙΡΕΙΑ",
   "gemi_url": "https://publicity.businessportal.gr/company/152123401000",
   "address": "Θουκυδίδου 4, Άγιος Στέφανος",
   "floor_m2": "",
   "solomon_status": "OPERATES",
   "solomon_mw": "",
   "lat": 38.1471049,
   "lon": 23.8514038,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "hellas-sat-koropi",
   "operator": "Ελλάς Σατ Μ.Α.Ε. (Hellas Sat, Arabsat group)",
   "project": "HS GR data centre (teleport campus)",
   "site": "Κωνσταντινουπόλεως 48, Κορωπί",
   "municipality": "Κρωπίας",
   "municipality_slug": "kropias",
   "region": "Attica",
   "grid_region": "attica",
   "status": "operating",
   "it_mw": null,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "Hellas Sat facilities",
     "publisher": "hellas-sat.cloud",
     "date": "",
     "url": "https://hellas-sat.cloud/facilities/"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Data Center Map — Athens (21 facilities)",
     "publisher": "datacentermap.com",
     "date": "2026-10-14",
     "url": "https://www.datacentermap.com/greece/athens/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://hellas-sat.cloud/facilities/"
    }
   ],
   "legal_entity": "ΕΛΛΑΣ ΣΑT ΜΟΝΟΠΡΟΣΩΠΗ ΑΝΩΝΥΜΗ ΕΤΑΙΡΕΙΑ ΥΠΗΡΕΣΙΕΣ ΔΟΡΥΦΟΡΙΚΩΝ ΣΥΣΤΗΜΑΤΩΝ ΚΑΙ ΕΠΙΚΟΙΝΩΝΙΩΝ",
   "gemi_url": "https://publicity.businessportal.gr/company/4658401000",
   "address": "Κωνσταντινουπόλεως 48, Κρωπία 194 00",
   "floor_m2": "",
   "solomon_status": "OPERATES",
   "solomon_mw": "",
   "lat": 37.9308599,
   "lon": 23.8758269,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "cosmote-telekom-rentis",
   "operator": "ΟΤΕ Α.Ε. (COSMOTE TELEKOM, Deutsche Telekom)",
   "project": "Rentis Data Center",
   "site": "Θηβών 38, Άγ. Ιωάννης Ρέντης",
   "municipality": "Νίκαιας-Αγ. Ι. Ρέντη",
   "municipality_slug": "nikaias-agiou-ioanni-renti",
   "region": "Attica",
   "grid_region": "attica",
   "status": "operating",
   "it_mw": null,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "COSMOTE TELEKOM markets an AI-ready DC for enterprises (kathimerini 2026)",
   "acts": [],
   "sources": [
    {
     "title": "Data Center Map — Athens (21 facilities)",
     "publisher": "datacentermap.com",
     "date": "2026-10-14",
     "url": "https://www.datacentermap.com/greece/athens/"
    },
    {
     "title": "Data center για τις AI ανάγκες των επιχειρήσεων στην Ελλάδα από την COSMOTE TELEKOM",
     "publisher": "kathimerini.gr",
     "date": "2026",
     "url": "https://www.kathimerini.gr/life/technology/564163075/data-center-gia-tis-ai-anagkes-ton-epicheiriseon-stin-ellada-apo-tin-cosmote-telekom/"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.kathimerini.gr/life/technology/564163075/data-center-gia-tis-ai-anagkes-ton-epicheiriseon-stin-ellada-apo-tin-cosmote-telekom/"
    }
   ],
   "legal_entity": "ΟΡΓΑΝΙΣΜΟΣ ΤΗΛΕΠΙΚΟΙΝΩΝΙΩΝ ΤΗΣ ΕΛΛΑΔΟΣ ΑΝΩΝΥΜΗ ΕΤΑΙΡΕΙΑ",
   "gemi_url": "https://publicity.businessportal.gr/company/1037501000",
   "address": "",
   "floor_m2": "",
   "solomon_status": "OPERATES",
   "solomon_mw": "",
   "lat": 37.9795673,
   "lon": 23.7267516,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "cosmote-telekom-acharnon",
   "operator": "ΟΤΕ Α.Ε. (COSMOTE TELEKOM, Deutsche Telekom)",
   "project": "Acharnon Data Center",
   "site": "Αχαρνών 434, Αθήνα",
   "municipality": "Αθηναίων",
   "municipality_slug": "athinaion",
   "region": "Attica",
   "grid_region": "attica",
   "status": "operating",
   "it_mw": null,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "Data Center Map — Athens (21 facilities)",
     "publisher": "datacentermap.com",
     "date": "2026-10-14",
     "url": "https://www.datacentermap.com/greece/athens/"
    },
    {
     "title": "Data center για τις AI ανάγκες των επιχειρήσεων στην Ελλάδα από την COSMOTE TELEKOM",
     "publisher": "kathimerini.gr",
     "date": "2026",
     "url": "https://www.kathimerini.gr/life/technology/564163075/data-center-gia-tis-ai-anagkes-ton-epicheiriseon-stin-ellada-apo-tin-cosmote-telekom/"
    }
   ],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "lancom-athens-marousi",
   "operator": "Lancom (LAN Communications ΕΠΕ)",
   "project": "Lancom Athens DC",
   "site": "Λεωφ. Κηφισίας 44/62 & Πρεμέτης, Μαρούσι",
   "municipality": "Αμαρουσίου",
   "municipality_slug": "amarousiou",
   "region": "Attica",
   "grid_region": "attica",
   "status": "operating",
   "it_mw": 0.5,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "0.5 MW (Solomon sheet); at capacity ceiling, expansion space held (powergame 2024-09-27)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Data Center Map — Athens (21 facilities)",
     "publisher": "datacentermap.com",
     "date": "2026-10-14",
     "url": "https://www.datacentermap.com/greece/athens/"
    },
    {
     "title": "Lancom: Επέκταση στην Τουρκία και διπλή επένδυση σε Κρήτη, Θεσσαλονίκη (Heraklion Gate)",
     "publisher": "powergame.gr",
     "date": "2024-09-27",
     "url": "https://www.powergame.gr/start-ups-digital/727640/lancom-epektasi-stin-tourkia-kai-dipli-ependysi-se-kriti-thessaloniki/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.thetotalbusiness.com/2024/01/23/lancom-data-centers-afxani-tziro-ependisis/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://lancom.gr/data-center/"
    }
   ],
   "legal_entity": "LAN COMMUNICATIONS ΕΤΑΙΡΕΙΑ ΠΕΡΙΟΡΙΣΜΕΝΗΣ ΕΥΘΥΝΗΣ",
   "gemi_url": "https://publicity.businessportal.gr/company/43400506000",
   "address": "Λεωφόρος Κηφισίας 62 & Πρεμέτης, Μαρούσι 151 25, Ελλάδα",
   "floor_m2": "",
   "solomon_status": "OPERATES",
   "solomon_mw": "0,5 MW",
   "lat": 37.9775384,
   "lon": 23.7349671,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "lancom-thessaloniki-centre",
   "operator": "Lancom (LAN Communications ΕΠΕ)",
   "project": "Lancom Thessaloniki DC",
   "site": "Βασ. Ηρακλείου 40, Θεσσαλονίκη",
   "municipality": "Θεσσαλονίκης",
   "municipality_slug": "thessalonikis",
   "region": "Central Macedonia",
   "grid_region": "central-macedonia",
   "status": "operating",
   "it_mw": 0.5,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "0.5 MW (Solomon sheet)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Data Center Map — Thessaloniki (4 facilities)",
     "publisher": "datacentermap.com",
     "date": "2026-10-14",
     "url": "https://www.datacentermap.com/greece/thessaloniki/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.thetotalbusiness.com/2024/01/23/lancom-data-centers-afxani-tziro-ependisis/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://lancom.gr/data-center/"
    }
   ],
   "legal_entity": "LAN COMMUNICATIONS ΕΤΑΙΡΕΙΑ ΠΕΡΙΟΡΙΣΜΕΝΗΣ ΕΥΘΥΝΗΣ",
   "gemi_url": "https://publicity.businessportal.gr/company/43400506000",
   "address": "Βασ. Ηρακλείου 40, Θεσσαλονίκη 546 23",
   "floor_m2": "",
   "solomon_status": "OPERATES",
   "solomon_mw": "0,5 MW",
   "lat": 40.6333328,
   "lon": 22.9435177,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "lancom-heraklion-gate",
   "operator": "Lancom",
   "project": "Heraklion Gate (fourth Lancom DC)",
   "site": "Ηράκλειο",
   "municipality": "Ηρακλείου",
   "municipality_slug": "irakleiou",
   "region": "Crete",
   "grid_region": "crete",
   "status": "planned",
   "it_mw": null,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "announced Sep 2024 for mid-2025; 'under construction' (tanea 2025-03); no 2026 confirmation found",
   "acts": [],
   "sources": [
    {
     "title": "Lancom: Επέκταση στην Τουρκία και διπλή επένδυση σε Κρήτη, Θεσσαλονίκη (Heraklion Gate)",
     "publisher": "powergame.gr",
     "date": "2024-09-27",
     "url": "https://www.powergame.gr/start-ups-digital/727640/lancom-epektasi-stin-tourkia-kai-dipli-ependysi-se-kriti-thessaloniki/"
    },
    {
     "title": "Τα data centers που θα χτιστούν σε ελληνικό έδαφος",
     "publisher": "tanea.gr",
     "date": "2025-03-08",
     "url": "https://www.tanea.gr/2025/03/08/economy/ta-data-centers-pou-tha-xtistoun-se-elliniko-edafos-online/"
    },
    {
     "title": "Πως προχωράνε οι επενδύσεις σε data centers στην Ελλάδα",
     "publisher": "cnn.gr",
     "date": "2025-01-30",
     "url": "https://www.cnn.gr/oikonomia/epixeiriseis/story/460451/pos-proxorane-oi-ependyseis-se-data-centers-stin-ellada"
    }
   ],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "interworks-thessaloniki",
   "operator": "Interworks",
   "project": "Interworks Thessaloniki Data Center",
   "site": "Ιατρού Γωγούση 8, Θεσσαλονίκη (Εύοσμος)",
   "municipality": "Κορδελιού-Ευόσμου",
   "municipality_slug": "kordeliou-evosmou",
   "region": "Central Macedonia",
   "grid_region": "central-macedonia",
   "status": "operating",
   "it_mw": null,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "Data Center Map — Thessaloniki (4 facilities)",
     "publisher": "datacentermap.com",
     "date": "2026-10-14",
     "url": "https://www.datacentermap.com/greece/thessaloniki/"
    }
   ],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "hostmein-marousi",
   "operator": "Hostmein ΙΚΕ",
   "project": "Hostmein Marousi",
   "site": "Λεωφ. Κηφισίας 32, Μαρούσι",
   "municipality": "Αμαρουσίου",
   "municipality_slug": "amarousiou",
   "region": "Attica",
   "grid_region": "attica",
   "status": "operating",
   "it_mw": null,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "Data Center Map — Athens (21 facilities)",
     "publisher": "datacentermap.com",
     "date": "2026-10-14",
     "url": "https://www.datacentermap.com/greece/athens/"
    },
    {
     "title": "Greece Colocation Data Center Portfolio Report 2025: 17 existing, 5 upcoming, 12 operators (names only in the release)",
     "publisher": "ResearchAndMarkets via GlobeNewswire",
     "date": "2026-01-06",
     "url": "https://www.globenewswire.com/fr/news-release/2026/01/06/3213368/0/en/Greece-Colocation-Data-Center-Portfolio-Report-2025-Detailed-Analysis-of-17-Existing-Data-Centers-5-Upcoming-Data-Centers-and-12-Major-Operators-Investors.html"
    }
   ],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "friktoria-frk01-volos",
   "operator": "Friktoria.com — Data Center Services",
   "project": "FRK01 (Tier III design)",
   "site": "Κουταρέλια 54, Βόλος",
   "municipality": "Βόλου",
   "municipality_slug": "volou",
   "region": "Thessaly",
   "grid_region": "thessaly",
   "status": "operating",
   "it_mw": null,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "Data Center Map — Volos (Friktoria FRK01)",
     "publisher": "datacentermap.com",
     "date": "2026-10-14",
     "url": "https://www.datacentermap.com/greece/volos/"
    },
    {
     "title": "Greece Colocation Data Center Portfolio Report 2025: 17 existing, 5 upcoming, 12 operators (names only in the release)",
     "publisher": "ResearchAndMarkets via GlobeNewswire",
     "date": "2026-01-06",
     "url": "https://www.globenewswire.com/fr/news-release/2026/01/06/3213368/0/en/Greece-Colocation-Data-Center-Portfolio-Report-2025-Detailed-Analysis-of-17-Existing-Data-Centers-5-Upcoming-Data-Centers-and-12-Major-Operators-Investors.html"
    }
   ],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "grnet-louros",
   "operator": "ΕΔΥΤΕ Α.Ε. (GRNET, Greek State)",
   "project": "Green Data Center Λούρος (hydro-powered)",
   "site": "Λούρος, Ξηροβούνι",
   "municipality": "Πρέβεζας",
   "municipality_slug": "prevezas",
   "region": "Epirus",
   "grid_region": "epirus",
   "status": "operating",
   "it_mw": 0.2,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "200 kW (Solomon sheet); PwC maps 0.4 MW of interest at Φιλιππιάδα",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "ΕΔΥΤΕ / GRNET data centres",
     "publisher": "grnet.gr",
     "date": "",
     "url": "https://grnet.gr/infrastructure/datacenters-grnet/"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://grnet.gr/infrastructure/datacenters-grnet/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://www.youtube.com/watch?v=fXNi_gWOQaM"
    }
   ],
   "legal_entity": "Εθνικό Δίκτυο Υποδομών Τεχνολογίας και Έρευνας Α.Ε.",
   "gemi_url": "https://publicity.businessportal.gr/company/3057201000",
   "address": "https://maps.app.goo.gl/KDWGfEzB2vxC7cVNA",
   "floor_m2": "",
   "solomon_status": "OPERATES",
   "solomon_mw": "200 ΚW",
   "lat": 39.251129,
   "lon": 20.868821,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "grnet-heraklion-voutes",
   "operator": "ΕΔΥΤΕ Α.Ε. (GRNET, Greek State)",
   "project": "Data Center Heraklion (University of Crete)",
   "site": "Πανεπιστήμιο Κρήτης, Βούτες",
   "municipality": "Ηρακλείου",
   "municipality_slug": "irakleiou",
   "region": "Crete",
   "grid_region": "crete",
   "status": "operating",
   "it_mw": 0.19,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "190 kW (Solomon sheet)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "ΕΔΥΤΕ / GRNET data centres",
     "publisher": "grnet.gr",
     "date": "",
     "url": "https://grnet.gr/infrastructure/datacenters-grnet/"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://grnet.gr/health/"
    }
   ],
   "legal_entity": "Εθνικό Δίκτυο Υποδομών Τεχνολογίας και Έρευνας Α.Ε.",
   "gemi_url": "https://publicity.businessportal.gr/company/3057201000",
   "address": "Πανεπιστήμιο Κρήτης, Βούτες, Ηράκλειο",
   "floor_m2": "",
   "solomon_status": "OPERATES",
   "solomon_mw": "190 ΚW",
   "lat": 35.3073124,
   "lon": 25.0826527,
   "geo_precision": "area",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "grnet-marousi-ministry",
   "operator": "ΕΔΥΤΕ Α.Ε. (GRNET, Greek State)",
   "project": "Data Centers 1, 2, 3 (Ministry of Education building)",
   "site": "Ανδρέα Παπανδρέου 37, Μαρούσι",
   "municipality": "Αμαρουσίου",
   "municipality_slug": "amarousiou",
   "region": "Attica",
   "grid_region": "attica",
   "status": "operating",
   "it_mw": null,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "ΕΔΥΤΕ / GRNET data centres",
     "publisher": "grnet.gr",
     "date": "",
     "url": "https://grnet.gr/infrastructure/datacenters-grnet/"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://grnet.gr/infrastructure/datacenters-grnet/"
    }
   ],
   "legal_entity": "Εθνικό Δίκτυο Υποδομών Τεχνολογίας και Έρευνας Α.Ε.",
   "gemi_url": "https://publicity.businessportal.gr/company/3057201000",
   "address": "Υπουργείο Παιδείας και Θρησκευμάτων, Ανδρέα Παπανδρέου 37, Μαρούσι",
   "floor_m2": "",
   "solomon_status": "OPERATES",
   "solomon_mw": "",
   "lat": 38.0457095,
   "lon": 23.7878158,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "grnet-ekt-palaio-faliro",
   "operator": "ΕΔΥΤΕ Α.Ε. (GRNET, Greek State)",
   "project": "Data Center — Εθνικό Κέντρο Τεκμηρίωσης",
   "site": "Ζεφύρου 56, Παλαιό Φάληρο",
   "municipality": "Παλαιού Φαλήρου",
   "municipality_slug": "palaiou-falirou",
   "region": "Attica",
   "grid_region": "attica",
   "status": "operating",
   "it_mw": 0.1,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "100 kW (Solomon sheet)",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "ΕΔΥΤΕ / GRNET data centres",
     "publisher": "grnet.gr",
     "date": "",
     "url": "https://grnet.gr/infrastructure/datacenters-grnet/"
    },
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    },
    {
     "title": "Solomon sheet sources",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://grnet.gr/infrastructure/datacenters-grnet/"
    }
   ],
   "legal_entity": "Εθνικό Δίκτυο Υποδομών Τεχνολογίας και Έρευνας Α.Ε.",
   "gemi_url": "https://publicity.businessportal.gr/company/3057201000",
   "address": "Ζεφύρου 56, Παλαιό Φάληρο",
   "floor_m2": "",
   "solomon_status": "OPERATES",
   "solomon_mw": "100 KW",
   "lat": 37.937331,
   "lon": 23.6955324,
   "geo_precision": "exact",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "datastore-ike",
   "operator": "Datastore Μονοπρόσωπη ΙΚΕ",
   "project": "Data Center (no public details)",
   "site": "",
   "municipality": "",
   "municipality_slug": "",
   "region": "",
   "grid_region": "",
   "status": "announced",
   "it_mw": null,
   "installed_mw": null,
   "investment_eur": null,
   "investment_note": "listed in Solomon's dataset as 'planning' with only the ΓΕΜΗ entity",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "Χάρτης Data Centers — site dataset (Google Sheet behind the map; copy in sources/solomon/)",
     "publisher": "Solomon",
     "date": "2026-10-05",
     "url": "https://wearesolomon.com/datacenters-gr/"
    }
   ],
   "legal_entity": "DATASTORE ΜΟΝΟΠΡΟΣΩΠΗ Ι.Κ.Ε.",
   "gemi_url": "https://publicity.businessportal.gr/company/188971417000",
   "address": "",
   "floor_m2": "",
   "solomon_status": "PLANNING",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  },
  {
   "id": "uae-greece-mou-500mw",
   "operator": "UAE–Greece intergovernmental MoU (investor unnamed; 'UAE interest' per businessdaily)",
   "project": "Up to 500 MW of data centres (country-level MoU, no site)",
   "site": "",
   "municipality": "",
   "municipality_slug": "",
   "region": "",
   "grid_region": "",
   "status": "mou",
   "it_mw": null,
   "installed_mw": 500,
   "investment_eur": null,
   "investment_note": "MoU Feb 2024 (cnn 2024-09-12); 'stated intent only, no announcements' (businessdaily 2026-09-13); DAMAC/Edgnex Spata + Kryoneri are the UAE projects actually filed",
   "cooling": "not published",
   "water_source": "not published",
   "water_m3y": null,
   "water_note": "",
   "strategic_investment": "",
   "timeline": "",
   "acts": [],
   "sources": [
    {
     "title": "Data Centers: Oι λόγοι που η Ελλάδα προσελκύει μεγάλες επενδύσεις (Google 5–6 → 40 MW, UAE MoU 500 MW)",
     "publisher": "cnn.gr",
     "date": "2024-09-12",
     "url": "https://www.cnn.gr/oikonomia/anaptyxi/story/438662/data-centers-oi-logoi-pou-i-ellada-proselkyei-megales-ependyseis"
    },
    {
     "title": "Επενδύσεις άνω των 5 δισ. έως 2030 για data center και το mega project της ΔΕΗ",
     "publisher": "businessdaily.gr",
     "date": "2026-09-13",
     "url": "https://www.businessdaily.gr/oikonomia/231471_ependyseis-ano-ton-5-dis-eos-2030-gia-data-center-kai-mega-project-tis-dei"
    }
   ],
   "legal_entity": "",
   "gemi_url": "",
   "address": "",
   "floor_m2": "",
   "solomon_status": "",
   "solomon_mw": "",
   "lat": null,
   "lon": null,
   "geo_precision": "",
   "eprm_ids": "",
   "eprm_adas": ""
  }
 ],
 "eprmDecisions": [
  {
   "eprm_id": 35678,
   "type": "aepo_essential_modification",
   "outcome": "positive",
   "duration_days": 15,
   "ada": "9ΚΧΧΟΡ1Κ-02Α",
   "protocol": "38076/11-06-2026",
   "document_url": "https://diavgeia.gov.gr/luminapi/api/decisions/9ΚΧΧΟΡ1Κ-02Α/document.pdf",
   "issued_at": "2026-06-24 00:00:00",
   "published_at": "2026-06-24 10:38:18",
   "licensing_authority": "Τμήμα Περιβαλλοντικού & Χωρικού Σχεδιασμού Αττικής Αποκεντρωμένη Διοίκηση",
   "application": "Υποβολή ΜΠΕ για διαδικασία τροποποίησης Απόφασης Έγκρισης Περιβαλλοντικών Όρων-ΑΕΠΟ- (παρ.2Β του αρ.3 και αρ.6 του Ν.4014/2011, όπως ισχύει)",
   "application_protocol": "78014/19-12-25",
   "category": "A2",
   "project_name": "Συγκρότημα Κέντρων Δεδομένων ATH01 HERMES Δήμου Παιανίας, Π.Ε. Ανατολικής Αττικής",
   "pet": "2509011421",
   "address": "Αγίου Λουκά 33, Παιανία",
   "lat": "37.942656967188",
   "lon": "23.873855266589",
   "natura2000": true,
   "project_types": "20. Κέντρα δεδομένων (Data centers)",
   "municipal_units": "ΔΗΜΟΤΙΚΗ ΕΝΟΤΗΤΑ ΠΑΙΑΝΙΑΣ",
   "carrier": "Data 4 Greece ΜΟΝΟΠΡΟΣΩΠΗ ΑΝΩΝΥΜΗ ΕΤΑΙΡΕΙΑ",
   "pulled_at": "2026-10-14"
  },
  {
   "eprm_id": 44404,
   "type": "aepo_nonessential_modification",
   "outcome": "positive",
   "duration_days": null,
   "ada": "9Φ7ΗΟΡ1Γ-ΨΗΛ",
   "protocol": "17294",
   "document_url": "https://diavgeia.gov.gr/luminapi/api/decisions/9Φ7ΗΟΡ1Γ-ΨΗΛ/document.pdf",
   "issued_at": "2026-05-17 00:00:00",
   "published_at": "2026-05-18 07:55:03",
   "licensing_authority": "Τμήμα Περιβαλλοντικού & Χωρικού Σχεδιασμού Δυτικής Μακεδονίας Αποκεντρωμένη Διοίκηση",
   "application": "Ανέγερση Πανεπιστημιούπολης Δυτικής Μακεδονίας στη Ζώνη Ενεργού Πολεοδομίας (ΖΕΠ) Δήμού Κοζάνης της Π.Ε. Κοζάνης",
   "application_protocol": "4210",
   "category": "A2",
   "project_name": "Ανέγερση Πανεπιστημιούπολης Δυτικής Μακεδονίας στη Ζώνη Ενεργού Πολεοδομίας (ΖΕΠ) Δήμού Κοζάνης της Π.Ε. Κοζάνης",
   "pet": "2601020023",
   "address": "Περιοχή ΖΕΠ",
   "lat": "40.279001292",
   "lon": "21.751263275",
   "natura2000": false,
   "project_types": "15. Εγκαταστάσεις εκπαίδευσης | 20. Κέντρα δεδομένων (Data centers)",
   "municipal_units": "ΔΗΜΟΤΙΚΗ ΕΝΟΤΗΤΑ ΚΟΖΑΝΗΣ",
   "carrier": "Πανεπιστήμιο Δυτικής Μακεδονίας",
   "pulled_at": "2026-10-14"
  },
  {
   "eprm_id": 45376,
   "type": "aepo_nonessential_modification",
   "outcome": "negative",
   "duration_days": null,
   "ada": "6ΜΣΡΟΡ1Κ-Ν1Θ",
   "protocol": "17978/16-03-2026",
   "document_url": "https://diavgeia.gov.gr/luminapi/api/decisions/6ΜΣΡΟΡ1Κ-Ν1Θ/document.pdf",
   "issued_at": "2026-03-17 00:00:00",
   "published_at": "2026-03-17 06:59:52",
   "licensing_authority": "Τμήμα Περιβαλλοντικού & Χωρικού Σχεδιασμού Αττικής Αποκεντρωμένη Διοίκηση",
   "application": "Αίτημα αξιολόγησης ως προς τον ουσιώδη ή μη χαρακτήρα των προτεινόμενων επικαιροποιήσεων του Data Center Olive Δήμου Σπάτων-Αρτέμιδος, Περιφερειακής Ενότητας Ανατολικής Αττικής",
   "application_protocol": "17635/14-03-2026",
   "category": "A2",
   "project_name": "Μελέτη Περιβαλλοντικών Επιπτώσεων Data Center Olive Δήμου Σπάτων-Αρτέμιδος, Περιφερειακής Ενότητας Ανατολικής Αττικής",
   "pet": "2506005921",
   "address": "Χριστούπολη, θέση \"Επιχειρηματικό Πάρκο Πέτρα Γιαλού Βούλια Προκαλήσι\" στα O.T. E41 ΚΑΙ E54 Κοινότητας Σπάτων-Λούτσας της Δημοτικής Ενότητας Σπάτων - Λούτσας, Δήμου Σπάτων - Αρτέμιδος, Περιφερειακή Ενότητα Ανατολικής Αττικής, Περιφέρεια Αττικής",
   "lat": "37.9809084",
   "lon": "23.9266612",
   "natura2000": false,
   "project_types": "20. Κέντρα δεδομένων (Data centers) | 11. Μεµονωµένα κέντρα υπερυψηλής τάσης και µεµονωµένοι υποσταθµοί επί της επιφάνειας του εδάφους (συµπεριλαµβάνονται και οι επεκτάσεις σε υφιστάµενους υποσταθµούς)",
   "municipal_units": "ΔΗΜΟΤΙΚΗ ΕΝΟΤΗΤΑ ΣΠΑΤΩΝ - ΛΟΥΤΣΑΣ",
   "carrier": "ΓΚΡΕΚΟ ΜΙ ΕΠΕΝΔΥΣΕΙΣ ΑΚΙΝΗΤΩΝ ΜΟΝΟΠΡΟΣΩΠΗ ΑΝΩΝΥΜΗ ΕΤΑΙΡΕΙΑ",
   "pulled_at": "2026-10-14"
  },
  {
   "eprm_id": 14966,
   "type": "aepo_creation",
   "outcome": "positive",
   "duration_days": 15,
   "ada": "6ΜΣΡΟΡ1Κ-Ν1Θ",
   "protocol": "3635/19-01-2026",
   "document_url": "https://diavgeia.gov.gr/luminapi/api/decisions/6ΜΣΡΟΡ1Κ-Ν1Θ/document.pdf",
   "issued_at": "2026-02-19 00:00:00",
   "published_at": "2026-02-19 10:52:31",
   "licensing_authority": "Τμήμα Περιβαλλοντικού & Χωρικού Σχεδιασμού Αττικής Αποκεντρωμένη Διοίκηση",
   "application": "Μελέτη Περιβαλλοντικών Επιπτώσεων Data Center Olive Δήμου Σπάτων-Αρτέμιδος, Περιφερειακής Ενότητας Ανατολικής Αττικής",
   "application_protocol": "37200/23-6-25",
   "category": "A2",
   "project_name": "Μελέτη Περιβαλλοντικών Επιπτώσεων Data Center Olive Δήμου Σπάτων-Αρτέμιδος, Περιφερειακής Ενότητας Ανατολικής Αττικής",
   "pet": "2506005921",
   "address": "Χριστούπολη, θέση \"Επιχειρηματικό Πάρκο Πέτρα Γιαλού Βούλια Προκαλήσι\" στα O.T. E41 ΚΑΙ E54 Κοινότητας Σπάτων-Λούτσας της Δημοτικής Ενότητας Σπάτων - Λούτσας, Δήμου Σπάτων - Αρτέμιδος, Περιφερειακή Ενότητα Ανατολικής Αττικής, Περιφέρεια Αττικής",
   "lat": "37.9809084",
   "lon": "23.9266612",
   "natura2000": null,
   "project_types": "20. Κέντρα δεδομένων (Data centers) | 11. Μεµονωµένα κέντρα υπερυψηλής τάσης και µεµονωµένοι υποσταθµοί επί της επιφάνειας του εδάφους (συµπεριλαµβάνονται και οι επεκτάσεις σε υφιστάµενους υποσταθµούς)",
   "municipal_units": "ΔΗΜΟΤΙΚΗ ΕΝΟΤΗΤΑ ΣΠΑΤΩΝ - ΛΟΥΤΣΑΣ",
   "carrier": "ΓΚΡΕΚΟ ΜΙ ΕΠΕΝΔΥΣΕΙΣ ΑΚΙΝΗΤΩΝ ΜΟΝΟΠΡΟΣΩΠΗ ΑΝΩΝΥΜΗ ΕΤΑΙΡΕΙΑ",
   "pulled_at": "2026-10-14"
  },
  {
   "eprm_id": 41542,
   "type": "aepo_creation",
   "outcome": "positive",
   "duration_days": null,
   "ada": "Ψ5ΚΒ46ΝΛΣΞ-ΡΓΓ",
   "protocol": "69748",
   "document_url": "https://diavgeia.gov.gr/luminapi/api/decisions/Ψ5ΚΒ46ΝΛΣΞ-ΡΓΓ/document.pdf",
   "issued_at": null,
   "published_at": "2024-09-25 00:00:00",
   "licensing_authority": null,
   "application": "Έγκριση χωροθέτησης και καθορισμός των περιβαλλοντικών όρων και των συνοδών έργων υποδομής για την κατασκευή και τη λειτουργία του επενδυτικού σχεδίου «Investment in Data Centers in Greece» για το Κέντρο Δεδομένων (Data Center), εντός του Επιχειρηματικού Πάρκου «Πέτρα Γιαλού - Βούλια – Προκαλήσι», στο Δήμο Σπάτων – Αρτέμιδος της Περιφερειακής Ενότητας Ανατολικής Αττικής της Περιφέρειας Αττικής (ΑΤΗ 04), στο πλαίσιο εφαρμογής του Ειδικού Σχεδίου Χωρικής Ανάπτυξης της Στρατηγικής Επένδυσης (ΕΣΧΑΣΕ) του επενδυτικού φορέα με την επωνυμία «Microsoft Operations 4733 Hellas Single Member S.A.»",
   "application_protocol": null,
   "category": "A2",
   "project_name": null,
   "pet": "2401005810",
   "address": null,
   "lat": "37.975090",
   "lon": "23.930150",
   "natura2000": false,
   "project_types": "",
   "municipal_units": "ΔΗΜΟΤΙΚΗ ΕΝΟΤΗΤΑ ΣΠΑΤΩΝ - ΛΟΥΤΣΑΣ",
   "carrier": "Microsoft Operations 4733",
   "pulled_at": "2026-10-14"
  }
 ]
}